The Development of the Management System for The Assignment Operations on Emergent Power Rehabilitation after a Nature Disaster

碩士 === 國立成功大學 === 土木工程學系專班 === 93 ===   The power line system is prone to be severely damaged by major nature disasters such as typhoon and earthquake. These impaired power lines have to be repaired as soon as possible. Because of limited resource available, it is important to determine the repairin...

Full description

Bibliographic Details
Main Authors: Ping-Chung Chiang, 江秉忠
Other Authors: Chung-Wei Feng
Format: Others
Language:zh-TW
Published: 2005
Online Access:http://ndltd.ncl.edu.tw/handle/13897492638109269161

Similar Items