The Development of the Management System for The Assignment Operations on Emergent Power Rehabilitation after a Nature Disaster
碩士 === 國立成功大學 === 土木工程學系專班 === 93 === The power line system is prone to be severely damaged by major nature disasters such as typhoon and earthquake. These impaired power lines have to be repaired as soon as possible. Because of limited resource available, it is important to determine the repairin...
Main Authors: | Ping-Chung Chiang, 江秉忠 |
---|---|
Other Authors: | Chung-Wei Feng |
Format: | Others |
Language: | zh-TW |
Published: |
2005
|
Online Access: | http://ndltd.ncl.edu.tw/handle/13897492638109269161 |
Similar Items
-
A Study on the Scheduling of the Emergency Rehabilitation Operations after a Major Disaster
by: Li-Wei Chang, et al.
Published: (2001) -
A Study on the Scheduling of the Emergency Rehabilitation and the Relief Distribution Operations after a Major Disaster
by: Yu-Lin Shih, et al.
Published: (2004) -
Disaster of Keelung Islet Wharf and its Rehabilitation
by: Chi-huang Chiang, et al.
Published: (2016) -
Applying heuristic traffic assignment in natural disaster evacuation: a decision support system
by: Hwang, Kuo-Ping
Published: (2015) -
Network Repairing Construction Routing for Repair Time after Natural Disasters
by: Ping-shan Ho, et al.
Published: (2008)