The Development of the Management System for The Assignment Operations on Emergent Power Rehabilitation after a Nature Disaster

碩士 === 國立成功大學 === 土木工程學系專班 === 93 ===   The power line system is prone to be severely damaged by major nature disasters such as typhoon and earthquake. These impaired power lines have to be repaired as soon as possible. Because of limited resource available, it is important to determine the repairin...

Full description

Bibliographic Details
Main Authors: Ping-Chung Chiang, 江秉忠
Other Authors: Chung-Wei Feng
Format: Others
Language:zh-TW
Published: 2005
Online Access:http://ndltd.ncl.edu.tw/handle/13897492638109269161
id ndltd-TW-093NCKU5015072
record_format oai_dc
spelling ndltd-TW-093NCKU50150722017-06-08T04:34:58Z http://ndltd.ncl.edu.tw/handle/13897492638109269161 The Development of the Management System for The Assignment Operations on Emergent Power Rehabilitation after a Nature Disaster 天然災害停電搶修指派作業管理系統之開發 Ping-Chung Chiang 江秉忠 碩士 國立成功大學 土木工程學系專班 93   The power line system is prone to be severely damaged by major nature disasters such as typhoon and earthquake. These impaired power lines have to be repaired as soon as possible. Because of limited resource available, it is important to determine the repairing priority of each the damaged power line incident and the resource assigned to fixing it. Such a decision problem can be formulated as the assignment problem. In the past, mathematical programming techniques and heuristic methods are applied to modeling the repairing assignment problem. However, mathematical models suffer the computational inefficiency; on the other hand, heuristic methods are problem dependent and cannot find the accurate solution for sure. Presently, Taiwan Power Company (TPC) processes the operation of repairing assignment based on the experience of the assignment engineer without any priority rules, which could be not efficient if too many power lines are damaged. Therefore, it is necessary to establish a decision support model to streamline the operation of repairing assignment.   This research developed a genetic algorithm model to solve the proposed repairing assignment problem by maximizing the power rehabilitation rate. In addition, the VB.net language is applied to integrate the above GA-based model with the damaged reporting system which has been used by TPC. This integrated information system provides quick and reliable tool to process the repairing assignment operation. In addition, a mobile information system which can download the information of damaged power line locations and transfers TPC power line coordinate to geographic coordinate is built on the PDA. Repairing workers can use this mobile information, GPS and GIS to reach the damaged power line locations as soon as possible. Results showed that this proposed model along with the integrated information system can provide efficient solutions to the repairing assignment operations. Chung-Wei Feng 馮重偉 2005 學位論文 ; thesis 109 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立成功大學 === 土木工程學系專班 === 93 ===   The power line system is prone to be severely damaged by major nature disasters such as typhoon and earthquake. These impaired power lines have to be repaired as soon as possible. Because of limited resource available, it is important to determine the repairing priority of each the damaged power line incident and the resource assigned to fixing it. Such a decision problem can be formulated as the assignment problem. In the past, mathematical programming techniques and heuristic methods are applied to modeling the repairing assignment problem. However, mathematical models suffer the computational inefficiency; on the other hand, heuristic methods are problem dependent and cannot find the accurate solution for sure. Presently, Taiwan Power Company (TPC) processes the operation of repairing assignment based on the experience of the assignment engineer without any priority rules, which could be not efficient if too many power lines are damaged. Therefore, it is necessary to establish a decision support model to streamline the operation of repairing assignment.   This research developed a genetic algorithm model to solve the proposed repairing assignment problem by maximizing the power rehabilitation rate. In addition, the VB.net language is applied to integrate the above GA-based model with the damaged reporting system which has been used by TPC. This integrated information system provides quick and reliable tool to process the repairing assignment operation. In addition, a mobile information system which can download the information of damaged power line locations and transfers TPC power line coordinate to geographic coordinate is built on the PDA. Repairing workers can use this mobile information, GPS and GIS to reach the damaged power line locations as soon as possible. Results showed that this proposed model along with the integrated information system can provide efficient solutions to the repairing assignment operations.
author2 Chung-Wei Feng
author_facet Chung-Wei Feng
Ping-Chung Chiang
江秉忠
author Ping-Chung Chiang
江秉忠
spellingShingle Ping-Chung Chiang
江秉忠
The Development of the Management System for The Assignment Operations on Emergent Power Rehabilitation after a Nature Disaster
author_sort Ping-Chung Chiang
title The Development of the Management System for The Assignment Operations on Emergent Power Rehabilitation after a Nature Disaster
title_short The Development of the Management System for The Assignment Operations on Emergent Power Rehabilitation after a Nature Disaster
title_full The Development of the Management System for The Assignment Operations on Emergent Power Rehabilitation after a Nature Disaster
title_fullStr The Development of the Management System for The Assignment Operations on Emergent Power Rehabilitation after a Nature Disaster
title_full_unstemmed The Development of the Management System for The Assignment Operations on Emergent Power Rehabilitation after a Nature Disaster
title_sort development of the management system for the assignment operations on emergent power rehabilitation after a nature disaster
publishDate 2005
url http://ndltd.ncl.edu.tw/handle/13897492638109269161
work_keys_str_mv AT pingchungchiang thedevelopmentofthemanagementsystemfortheassignmentoperationsonemergentpowerrehabilitationafteranaturedisaster
AT jiāngbǐngzhōng thedevelopmentofthemanagementsystemfortheassignmentoperationsonemergentpowerrehabilitationafteranaturedisaster
AT pingchungchiang tiānránzāihàitíngdiànqiǎngxiūzhǐpàizuòyèguǎnlǐxìtǒngzhīkāifā
AT jiāngbǐngzhōng tiānránzāihàitíngdiànqiǎngxiūzhǐpàizuòyèguǎnlǐxìtǒngzhīkāifā
AT pingchungchiang developmentofthemanagementsystemfortheassignmentoperationsonemergentpowerrehabilitationafteranaturedisaster
AT jiāngbǐngzhōng developmentofthemanagementsystemfortheassignmentoperationsonemergentpowerrehabilitationafteranaturedisaster
_version_ 1718456102960496640