An approach for implementing Risk-Informed evaluation on Check valves in Taiwan BWR type Nuclear Power Plant
碩士 === 龍華科技大學 === 機械系碩士班 === 93 === Implementing Risk-informed Inservice Testing program provides good aspect to the nuclear power plant licensee as an alternating program in current ASME Section XI and 10 CFR 50.55a relevant testing programs. RI-IST concentrates testing resources on high significan...
Main Authors: | Yuan-Chih Li, 李元志 |
---|---|
Other Authors: | Kuen Ting |
Format: | Others |
Language: | zh-TW |
Published: |
2005
|
Online Access: | http://ndltd.ncl.edu.tw/handle/59916004011635477800 |
Similar Items
-
An Assessment of BWR Nuclear Power Plant’s Safety
by: Tian , Yi-Cheng, et al.
Published: (2010) -
The Studies on Risk-informed evaluations for Inservice Inspection and Inservice Testing of Nuclear Power Plant
by: Yuan-Chih Li, et al.
Published: (2011) -
A Study on the Evaluation and Assessment of the EOP Operational Curve Limits for BWR Nuclear Power Plants
by: Jyh-Jun Chen, et al.
Published: (2011) -
CONTINUOUS-TIME OPTIMAL CONTROL OF A SIMULATED BOILING WATER NUCLEAR (BWR) POWER PLANT.
by: BOADU, HERBERT ODAME.
Published: (1985) -
A study of Wear Rate Predicted for Pipe Wall Testing Operation in BWR Power Plant
by: Chih-Ming,Chou, et al.
Published: (2013)