A Genetic Algorithm for Resource Constrained Project Scheduling Problem
碩士 === 崑山科技大學 === 企業管理研究所 === 93 === In this study, we develop a genetic algorithm to solve the resource-constrained project scheduling problem, which is a well-known NP-hard problem. For treating infeasible solutions, our approach is based on the design of fitness function which use penalizing stra...
Main Authors: | Yu-Chou Wu, 吳育周 |
---|---|
Other Authors: | none |
Format: | Others |
Language: | zh-TW |
Published: |
2005
|
Online Access: | http://ndltd.ncl.edu.tw/handle/4p9b38 |
Similar Items
-
Genetic Algorithm for Singular Resource Constrained Project Scheduling Problems
by: Firoz Mahmud, et al.
Published: (2021-01-01) -
A GENETIC ALGORITHM FOR THE RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM (RCPSP)
by: Edgar Gutiérrez Franco, et al.
Published: (2008-01-01) -
An algorithm for the resource constrained project scheduling problem
by: Johnson, Thomas Joel Russell, 1937-
Published: (2005) -
Applying Genetic Algorithm to Resource Constrained Multi-Project Scheduling Problems
by: Wun-Hao Jhong, et al.
Published: (2008) -
A Genetic Algorithms for the Resource Constrained Project Scheduling Problem with Multi-Mode
by: Ming Tu Chien, et al.
Published: (1999)