The financial model analysis for BOT and Design Build contracts using – A case study of university dormitory construction project.
碩士 === 中華大學 === 營建管理研究所 === 93 === In recent years, it is getting common practice to adopt BOT (Build-Operate-Transfer) or Design Build model for contracting of public infrastructure projects. Due to the different work scopes, the financial feasibility analysis are quite different between these two...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2005
|
Online Access: | http://ndltd.ncl.edu.tw/handle/95633760215593775409 |
id |
ndltd-TW-093CHPI0718033 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-093CHPI07180332016-06-08T04:13:18Z http://ndltd.ncl.edu.tw/handle/95633760215593775409 The financial model analysis for BOT and Design Build contracts using – A case study of university dormitory construction project. 從業主觀點比較BOT與統包專案之專案財務分析模式-以「T大學人宿舍專案」為例 Ling Sung 宋玲 碩士 中華大學 營建管理研究所 93 In recent years, it is getting common practice to adopt BOT (Build-Operate-Transfer) or Design Build model for contracting of public infrastructure projects. Due to the different work scopes, the financial feasibility analysis are quite different between these two contracting models. It is sometimes confusing for the project owner to execute the contract without throughout understanding of the characters of these two models. As a result, this thesis aims at establishing the financial models for both BOT and Design/Build contracts from the viewpoint of project financial feasibility analysis during the conceptual planning stage for a specific project. The study develops feasibility flowcharts for two different contracting models applying on a college dormitory construction the result of this study also provide the government agents an useful tool to choose an approcpriate contracting model for their project during the conceptual planning stage. Wen-der Yu 余文德 2005 學位論文 ; thesis 121 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 中華大學 === 營建管理研究所 === 93 === In recent years, it is getting common practice to adopt BOT (Build-Operate-Transfer) or Design Build model for contracting of public infrastructure projects. Due to the different work scopes, the financial feasibility analysis are quite different between these two contracting models. It is sometimes confusing for the project owner to execute the contract without throughout understanding of the characters of these two models. As a result, this thesis aims at establishing the financial models for both BOT and Design/Build contracts from the viewpoint of project financial feasibility analysis during the conceptual planning stage for a specific project. The study develops feasibility flowcharts for two different contracting models applying on a college dormitory construction the result of this study also provide the government agents an useful tool to choose an approcpriate contracting model for their project during the conceptual planning stage.
|
author2 |
Wen-der Yu |
author_facet |
Wen-der Yu Ling Sung 宋玲 |
author |
Ling Sung 宋玲 |
spellingShingle |
Ling Sung 宋玲 The financial model analysis for BOT and Design Build contracts using – A case study of university dormitory construction project. |
author_sort |
Ling Sung |
title |
The financial model analysis for BOT and Design Build contracts using – A case study of university dormitory construction project. |
title_short |
The financial model analysis for BOT and Design Build contracts using – A case study of university dormitory construction project. |
title_full |
The financial model analysis for BOT and Design Build contracts using – A case study of university dormitory construction project. |
title_fullStr |
The financial model analysis for BOT and Design Build contracts using – A case study of university dormitory construction project. |
title_full_unstemmed |
The financial model analysis for BOT and Design Build contracts using – A case study of university dormitory construction project. |
title_sort |
financial model analysis for bot and design build contracts using – a case study of university dormitory construction project. |
publishDate |
2005 |
url |
http://ndltd.ncl.edu.tw/handle/95633760215593775409 |
work_keys_str_mv |
AT lingsung thefinancialmodelanalysisforbotanddesignbuildcontractsusingacasestudyofuniversitydormitoryconstructionproject AT sònglíng thefinancialmodelanalysisforbotanddesignbuildcontractsusingacasestudyofuniversitydormitoryconstructionproject AT lingsung cóngyèzhǔguāndiǎnbǐjiàobotyǔtǒngbāozhuānànzhīzhuānàncáiwùfēnxīmóshìyǐtdàxuérénsùshězhuānànwèilì AT sònglíng cóngyèzhǔguāndiǎnbǐjiàobotyǔtǒngbāozhuānànzhīzhuānàncáiwùfēnxīmóshìyǐtdàxuérénsùshězhuānànwèilì AT lingsung financialmodelanalysisforbotanddesignbuildcontractsusingacasestudyofuniversitydormitoryconstructionproject AT sònglíng financialmodelanalysisforbotanddesignbuildcontractsusingacasestudyofuniversitydormitoryconstructionproject |
_version_ |
1718296733764550656 |