Research on the Construction Hazard & Risk Management of the 3D-Railway Engineering

碩士 === 中華大學 === 營建管理研究所 === 93 === By reviewing the construction carelessness of the railway reconstruction, which would easily influence the nearby railway under operation, experiencing dramatic threats and loses to the life, properties, environment and the society. The majority of this research wi...

Full description

Bibliographic Details
Main Authors: HSIAO CHIEN HE, 蕭建和
Other Authors: 鄭紹材
Format: Others
Language:zh-TW
Published: 2005
Online Access:http://ndltd.ncl.edu.tw/handle/02690199212657991304
id ndltd-TW-093CHPI0718031
record_format oai_dc
spelling ndltd-TW-093CHPI07180312015-10-13T11:39:19Z http://ndltd.ncl.edu.tw/handle/02690199212657991304 Research on the Construction Hazard & Risk Management of the 3D-Railway Engineering 鐵路立體化工程施工災害及風險管理之研究 HSIAO CHIEN HE 蕭建和 碩士 中華大學 營建管理研究所 93 By reviewing the construction carelessness of the railway reconstruction, which would easily influence the nearby railway under operation, experiencing dramatic threats and loses to the life, properties, environment and the society. The majority of this research will therefore be concluded into three subjects: Risk Confirmation, Risk Analyze and Risk Management (include information feedbacks). First, by gathering relative information or data to confirm the risk factors such as intrusion of railway clearance, electric shock, rail sagging and astray. Then analyze the risks of causing the possible hazards through charts. And finally through the careful examination and integration to process and manage the risk. Last, the result and the information contained in this research should be treated as a useful tool or references to deduct the uncertain risks and loses for the railway reconstruction engineering 鄭紹材 2005 學位論文 ; thesis 99 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 中華大學 === 營建管理研究所 === 93 === By reviewing the construction carelessness of the railway reconstruction, which would easily influence the nearby railway under operation, experiencing dramatic threats and loses to the life, properties, environment and the society. The majority of this research will therefore be concluded into three subjects: Risk Confirmation, Risk Analyze and Risk Management (include information feedbacks). First, by gathering relative information or data to confirm the risk factors such as intrusion of railway clearance, electric shock, rail sagging and astray. Then analyze the risks of causing the possible hazards through charts. And finally through the careful examination and integration to process and manage the risk. Last, the result and the information contained in this research should be treated as a useful tool or references to deduct the uncertain risks and loses for the railway reconstruction engineering
author2 鄭紹材
author_facet 鄭紹材
HSIAO CHIEN HE
蕭建和
author HSIAO CHIEN HE
蕭建和
spellingShingle HSIAO CHIEN HE
蕭建和
Research on the Construction Hazard & Risk Management of the 3D-Railway Engineering
author_sort HSIAO CHIEN HE
title Research on the Construction Hazard & Risk Management of the 3D-Railway Engineering
title_short Research on the Construction Hazard & Risk Management of the 3D-Railway Engineering
title_full Research on the Construction Hazard & Risk Management of the 3D-Railway Engineering
title_fullStr Research on the Construction Hazard & Risk Management of the 3D-Railway Engineering
title_full_unstemmed Research on the Construction Hazard & Risk Management of the 3D-Railway Engineering
title_sort research on the construction hazard & risk management of the 3d-railway engineering
publishDate 2005
url http://ndltd.ncl.edu.tw/handle/02690199212657991304
work_keys_str_mv AT hsiaochienhe researchontheconstructionhazardriskmanagementofthe3drailwayengineering
AT xiāojiànhé researchontheconstructionhazardriskmanagementofthe3drailwayengineering
AT hsiaochienhe tiělùlìtǐhuàgōngchéngshīgōngzāihàijífēngxiǎnguǎnlǐzhīyánjiū
AT xiāojiànhé tiělùlìtǐhuàgōngchéngshīgōngzāihàijífēngxiǎnguǎnlǐzhīyánjiū
_version_ 1716846373753585664