Using three-time estimate approach for construction schedule delay analysis
碩士 === 中華大學 === 營建管理研究所 === 93 === As construction projects being complicated, the chance of schedule delays in the projects is increased. How to accurately analyze the impact of a delayed activity on a project is the main purpose of existed delay analysis methods. When the completion of a project i...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2005
|
Online Access: | http://ndltd.ncl.edu.tw/handle/28961736643367390983 |
id |
ndltd-TW-093CHPI0718020 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-093CHPI07180202016-06-08T04:13:59Z http://ndltd.ncl.edu.tw/handle/28961736643367390983 Using three-time estimate approach for construction schedule delay analysis 三時估計法於時程延遲預估之研究 Ya-Ling Teng 鄧雅玲 碩士 中華大學 營建管理研究所 93 As construction projects being complicated, the chance of schedule delays in the projects is increased. How to accurately analyze the impact of a delayed activity on a project is the main purpose of existed delay analysis methods. When the completion of a project is delayed, to identify a single activity’s contribution to the project can be as a basis for further delay claims; besides, when an activity is delayed before a project completed, to forecast its contribution of extending project’s completion can be used for reducing the chance of a project delayed by the activity. Jonathan Jingsheng Shi, et al. have proposed a delay analysis method of consisting of several mathematical equations based on CPM approach with a single estimate for each activity’s duration. This research fixed the drawbacks of above method and then integrated the modified method and the concept of three-time estimate approach for each activity to develop an innovative delay analysis method that can be used to forecast a delayed activity’s contribution probability to a project. This research also developed a simple system, implemented on the platform of Microsoft Project with Visual Basic Application programming language, to serve as a tool for analyzing the delay information before and after a construction project completed. Jyh-Bin Yang 楊智斌 老師 2005 學位論文 ; thesis 165 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 中華大學 === 營建管理研究所 === 93 === As construction projects being complicated, the chance of schedule delays in the projects is increased. How to accurately analyze the impact of a delayed activity on a project is the main purpose of existed delay analysis methods. When the completion of a project is delayed, to identify a single activity’s contribution to the project can be as a basis for further delay claims; besides, when an activity is delayed before a project completed, to forecast its contribution of extending project’s completion can be used for reducing the chance of a project delayed by the activity. Jonathan Jingsheng Shi, et al. have proposed a delay analysis method of consisting of several mathematical equations based on CPM approach with a single estimate for each activity’s duration. This research fixed the drawbacks of above method and then integrated the modified method and the concept of three-time estimate approach for each activity to develop an innovative delay analysis method that can be used to forecast a delayed activity’s contribution probability to a project. This research also developed a simple system, implemented on the platform of Microsoft Project with Visual Basic Application programming language, to serve as a tool for analyzing the delay information before and after a construction project completed.
|
author2 |
Jyh-Bin Yang |
author_facet |
Jyh-Bin Yang Ya-Ling Teng 鄧雅玲 |
author |
Ya-Ling Teng 鄧雅玲 |
spellingShingle |
Ya-Ling Teng 鄧雅玲 Using three-time estimate approach for construction schedule delay analysis |
author_sort |
Ya-Ling Teng |
title |
Using three-time estimate approach for construction schedule delay analysis |
title_short |
Using three-time estimate approach for construction schedule delay analysis |
title_full |
Using three-time estimate approach for construction schedule delay analysis |
title_fullStr |
Using three-time estimate approach for construction schedule delay analysis |
title_full_unstemmed |
Using three-time estimate approach for construction schedule delay analysis |
title_sort |
using three-time estimate approach for construction schedule delay analysis |
publishDate |
2005 |
url |
http://ndltd.ncl.edu.tw/handle/28961736643367390983 |
work_keys_str_mv |
AT yalingteng usingthreetimeestimateapproachforconstructionscheduledelayanalysis AT dèngyǎlíng usingthreetimeestimateapproachforconstructionscheduledelayanalysis AT yalingteng sānshígūjìfǎyúshíchéngyánchíyùgūzhīyánjiū AT dèngyǎlíng sānshígūjìfǎyúshíchéngyánchíyùgūzhīyánjiū |
_version_ |
1718298184167456768 |