Using three-time estimate approach for construction schedule delay analysis

碩士 === 中華大學 === 營建管理研究所 === 93 === As construction projects being complicated, the chance of schedule delays in the projects is increased. How to accurately analyze the impact of a delayed activity on a project is the main purpose of existed delay analysis methods. When the completion of a project i...

Full description

Bibliographic Details
Main Authors: Ya-Ling Teng, 鄧雅玲
Other Authors: Jyh-Bin Yang
Format: Others
Language:zh-TW
Published: 2005
Online Access:http://ndltd.ncl.edu.tw/handle/28961736643367390983
Description
Summary:碩士 === 中華大學 === 營建管理研究所 === 93 === As construction projects being complicated, the chance of schedule delays in the projects is increased. How to accurately analyze the impact of a delayed activity on a project is the main purpose of existed delay analysis methods. When the completion of a project is delayed, to identify a single activity’s contribution to the project can be as a basis for further delay claims; besides, when an activity is delayed before a project completed, to forecast its contribution of extending project’s completion can be used for reducing the chance of a project delayed by the activity. Jonathan Jingsheng Shi, et al. have proposed a delay analysis method of consisting of several mathematical equations based on CPM approach with a single estimate for each activity’s duration. This research fixed the drawbacks of above method and then integrated the modified method and the concept of three-time estimate approach for each activity to develop an innovative delay analysis method that can be used to forecast a delayed activity’s contribution probability to a project. This research also developed a simple system, implemented on the platform of Microsoft Project with Visual Basic Application programming language, to serve as a tool for analyzing the delay information before and after a construction project completed.