A Study of Maintenance Performance Indices for Taipei Metro Electrical Multiple Unit Using Balanced Scoring Card Method
碩士 === 元智大學 === 工業工程與管理學系 === 92 === ABSTRACT This thesis develops maintenance performance indices (MPIs) using balanced scoring card method for Taipei Metro Electrical Multiple Units (EMU). After data collection and analysis from its managers and employees, 20 critical MPI’s are decided...
Main Author: | 陳國棟 |
---|---|
Other Authors: | Chieh-Yuan Tsai |
Format: | Others |
Language: | zh-TW |
Published: |
2004
|
Online Access: | http://ndltd.ncl.edu.tw/handle/97012882961223803959 |
Similar Items
-
Electric Multiple Unit Maintenance Scheduling ─An example of Taipei MRT
by: Ching-wen CHEN, et al.
Published: (2013) -
Balanced score card
by: Hong Pao-Shan, et al.
Published: (2006) -
An integrated framework for outsourcing using balanced score card and ELECTRE III
by: Sareh Namazi, et al.
Published: (2011-04-01) -
Performance Measurement with Balanced Score Card in Museums
by: WU, SHAN-YING, et al.
Published: (2017) -
Análisis financiero bajo Balanced Score Card
by: Juan Gaytán Cortés
Published: (2016-02-01)