Optimal operation of Chiller and Cooling tower for semiconductor Factory
碩士 === 國立臺北科技大學 === 冷凍與低溫科技研究所 === 92 === Recently, the semiconductor manufacturing industry not only fast growth but also power consumption intensive. The running reliability will reduce, therefore to 『save power consumption』is an important item. It can be seen in the documents that the power consu...
Main Authors: | Ching-Liang Chen, 陳清良 |
---|---|
Other Authors: | Yung-Chung Chang |
Format: | Others |
Language: | zh-TW |
Published: |
2004
|
Online Access: | http://ndltd.ncl.edu.tw/handle/60759039197562887531 |
Similar Items
-
Optimizing existing cooling towers for absorption chillers replacement of electric chillers
by: Braswell, Michael Timothy, Jr.
Published: (2007) -
The Investigation of Methodologies for Optimal Control of Chillers and Cooling Towers System
by: Chun-Chuan Chang, et al.
Published: (2007) -
Analytsis and performance optimization of commercial chiller/cooling tower systems
by: Liu, Hubert H.
Published: (2007) -
Design optimization of cooling tower systems for dual-stage absorption chillers
by: Moorehead, Lynnette Ann
Published: (2007) -
Modeling and general optimization of commercial building chiller/cooling tower systems
by: Weber, Eric Dean
Published: (2007)