Scheduling for Capacity Constrained Resources under the Condition of Reentry
碩士 === 南台科技大學 === 工業管理研究所 === 92 === Drum-Buffer-Rope (DBR) has been shown to be successful in planning, scheduling and controlling manufacturing operations. DBR provides sophisticated approaches for identifying and exploiting capacity constrained resources (CCR) in the production flows. However,...
Main Author: | |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2004
|
Online Access: | http://ndltd.ncl.edu.tw/handle/84607745524245023262 |