Research for BOT construction management mechanism
碩士 === 國立臺灣大學 === 土木工程學研究所 === 92 === Because of the Taiwan government’s policy to develop infrastructure with private finance approach,the number of BOT projects increases rapidly in these years. There are many aspects that are different between the traditional method and BOT menthod, and therefore...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2004
|
Online Access: | http://ndltd.ncl.edu.tw/handle/81384376817160636863 |
id |
ndltd-TW-092NTU05015124 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-092NTU050151242016-06-10T04:16:18Z http://ndltd.ncl.edu.tw/handle/81384376817160636863 Research for BOT construction management mechanism BOT工程管理機制之研究 Chen-Chih Hung 洪建智 碩士 國立臺灣大學 土木工程學研究所 92 Because of the Taiwan government’s policy to develop infrastructure with private finance approach,the number of BOT projects increases rapidly in these years. There are many aspects that are different between the traditional method and BOT menthod, and therefore, we should reconsider the construction management system. In this research, the first task is to identify the role of the government in infrastructure development, then to study the quality and progress control system currently used in practice, followed by finding out an appropriate and efficient mechanism for BOT mornitoring and management, and lastly to build the principles for government’s quality and progress control system. Case study is one of the most import methods in this reasch. The case study is to study the systems that are currently applied in different countries such as UK and Japan, and to identity the government position regarding quality and progress management in different BOT cases. According to the results of this pilot study, we will conclude some rules for government to estibilish the mechanism of BOT quality and process managemnt. mechanism for BOT mornitoring or management.and make up a practicable principle of quality and progress contoral system for government. Case study is the most import method for this reasch, and to assist with paper study and refere to the systems theose are runnig now just like systems of UK and JP ,and identity the government position in different BOT case should be or should do about quality and progress control. With the result of front analysis ,we will point out some rule for government to estibilish the mechanism for BOT quality and process control S. Ping Ho 荷世平 2004 學位論文 ; thesis 152 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立臺灣大學 === 土木工程學研究所 === 92 === Because of the Taiwan government’s policy to develop infrastructure with private finance approach,the number of BOT projects increases rapidly in these years. There are many aspects that are different between the traditional method and BOT menthod, and therefore, we should reconsider the construction management system. In this research, the first task is to identify the role of the government in infrastructure development, then to study the quality and progress control system currently used in practice, followed by finding out an appropriate and efficient mechanism for BOT mornitoring and management, and lastly to build the principles for government’s quality and progress control system.
Case study is one of the most import methods in this reasch. The case study is to study the systems that are currently applied in different countries such as UK and Japan, and to identity the government position regarding quality and progress management in different BOT cases. According to the results of this pilot study, we will conclude some rules for government to estibilish the mechanism of BOT quality and process managemnt.
mechanism for BOT mornitoring or management.and make up a practicable principle of quality and progress contoral system for government.
Case study is the most import method for this reasch, and to assist with paper study and refere to the systems theose are runnig now just like systems of UK and JP ,and identity the government position in different BOT case should be or should do about quality and progress control. With the result of front analysis ,we will point out some rule for government to estibilish the mechanism for BOT quality and process control
|
author2 |
S. Ping Ho |
author_facet |
S. Ping Ho Chen-Chih Hung 洪建智 |
author |
Chen-Chih Hung 洪建智 |
spellingShingle |
Chen-Chih Hung 洪建智 Research for BOT construction management mechanism |
author_sort |
Chen-Chih Hung |
title |
Research for BOT construction management mechanism |
title_short |
Research for BOT construction management mechanism |
title_full |
Research for BOT construction management mechanism |
title_fullStr |
Research for BOT construction management mechanism |
title_full_unstemmed |
Research for BOT construction management mechanism |
title_sort |
research for bot construction management mechanism |
publishDate |
2004 |
url |
http://ndltd.ncl.edu.tw/handle/81384376817160636863 |
work_keys_str_mv |
AT chenchihhung researchforbotconstructionmanagementmechanism AT hóngjiànzhì researchforbotconstructionmanagementmechanism AT chenchihhung botgōngchéngguǎnlǐjīzhìzhīyánjiū AT hóngjiànzhì botgōngchéngguǎnlǐjīzhìzhīyánjiū |
_version_ |
1718301109368389632 |