A study of optimal schedule model of the multi-work in the
碩士 === 國防管理學院 === 後勤管理研究所 === 92 === In this study, we consider to extend single-machine scheduling problem and get minimize the total tardiness time. We used local scheduling-EDD to solve problems. This study only considered single-machine scheduling ruther them rescheduling and mult-mac...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2004
|
Online Access: | http://ndltd.ncl.edu.tw/handle/43122052469564486514 |
id |
ndltd-TW-092NDMC1715005 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-092NDMC17150052016-06-17T04:16:19Z http://ndltd.ncl.edu.tw/handle/43122052469564486514 A study of optimal schedule model of the multi-work in the 單一工作站多項工作排程最佳化模式建構 Yu-Lan Hsiao 蕭玉蘭 碩士 國防管理學院 後勤管理研究所 92 In this study, we consider to extend single-machine scheduling problem and get minimize the total tardiness time. We used local scheduling-EDD to solve problems. This study only considered single-machine scheduling ruther them rescheduling and mult-machine scheduling problem. The model is 0-1 mixed integer problem, also NP-Hard problem. We implemented proposed algorithms by Visual C++ and CPLEX software. From the result of test problems, we show that the cost of CPU time is not only depend on the size of problem but also depend on the structure of problem. 陳珠龍 劉家熙 2004 學位論文 ; thesis 85 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國防管理學院 === 後勤管理研究所 === 92 === In this study, we consider to extend single-machine scheduling problem and get minimize the total tardiness time.
We used local scheduling-EDD to solve problems. This study only considered single-machine scheduling ruther them rescheduling and mult-machine scheduling problem. The model is 0-1 mixed integer problem, also NP-Hard problem. We implemented proposed algorithms by Visual C++ and CPLEX software. From the result of test problems, we show that the cost of CPU time is not only depend on the size of problem but also depend on the structure of problem.
|
author2 |
陳珠龍 |
author_facet |
陳珠龍 Yu-Lan Hsiao 蕭玉蘭 |
author |
Yu-Lan Hsiao 蕭玉蘭 |
spellingShingle |
Yu-Lan Hsiao 蕭玉蘭 A study of optimal schedule model of the multi-work in the |
author_sort |
Yu-Lan Hsiao |
title |
A study of optimal schedule model of the multi-work in the |
title_short |
A study of optimal schedule model of the multi-work in the |
title_full |
A study of optimal schedule model of the multi-work in the |
title_fullStr |
A study of optimal schedule model of the multi-work in the |
title_full_unstemmed |
A study of optimal schedule model of the multi-work in the |
title_sort |
study of optimal schedule model of the multi-work in the |
publishDate |
2004 |
url |
http://ndltd.ncl.edu.tw/handle/43122052469564486514 |
work_keys_str_mv |
AT yulanhsiao astudyofoptimalschedulemodelofthemultiworkinthe AT xiāoyùlán astudyofoptimalschedulemodelofthemultiworkinthe AT yulanhsiao dānyīgōngzuòzhànduōxiànggōngzuòpáichéngzuìjiāhuàmóshìjiàngòu AT xiāoyùlán dānyīgōngzuòzhànduōxiànggōngzuòpáichéngzuìjiāhuàmóshìjiàngòu AT yulanhsiao studyofoptimalschedulemodelofthemultiworkinthe AT xiāoyùlán studyofoptimalschedulemodelofthemultiworkinthe |
_version_ |
1718307575162732544 |