A study of optimal schedule model of the multi-work in the

碩士 === 國防管理學院 === 後勤管理研究所 === 92 === In this study, we consider to extend single-machine scheduling problem and get minimize the total tardiness time. We used local scheduling-EDD to solve problems. This study only considered single-machine scheduling ruther them rescheduling and mult-mac...

Full description

Bibliographic Details
Main Authors: Yu-Lan Hsiao, 蕭玉蘭
Other Authors: 陳珠龍
Format: Others
Language:zh-TW
Published: 2004
Online Access:http://ndltd.ncl.edu.tw/handle/43122052469564486514
id ndltd-TW-092NDMC1715005
record_format oai_dc
spelling ndltd-TW-092NDMC17150052016-06-17T04:16:19Z http://ndltd.ncl.edu.tw/handle/43122052469564486514 A study of optimal schedule model of the multi-work in the 單一工作站多項工作排程最佳化模式建構 Yu-Lan Hsiao 蕭玉蘭 碩士 國防管理學院 後勤管理研究所 92 In this study, we consider to extend single-machine scheduling problem and get minimize the total tardiness time. We used local scheduling-EDD to solve problems. This study only considered single-machine scheduling ruther them rescheduling and mult-machine scheduling problem. The model is 0-1 mixed integer problem, also NP-Hard problem. We implemented proposed algorithms by Visual C++ and CPLEX software. From the result of test problems, we show that the cost of CPU time is not only depend on the size of problem but also depend on the structure of problem. 陳珠龍 劉家熙 2004 學位論文 ; thesis 85 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國防管理學院 === 後勤管理研究所 === 92 === In this study, we consider to extend single-machine scheduling problem and get minimize the total tardiness time. We used local scheduling-EDD to solve problems. This study only considered single-machine scheduling ruther them rescheduling and mult-machine scheduling problem. The model is 0-1 mixed integer problem, also NP-Hard problem. We implemented proposed algorithms by Visual C++ and CPLEX software. From the result of test problems, we show that the cost of CPU time is not only depend on the size of problem but also depend on the structure of problem.
author2 陳珠龍
author_facet 陳珠龍
Yu-Lan Hsiao
蕭玉蘭
author Yu-Lan Hsiao
蕭玉蘭
spellingShingle Yu-Lan Hsiao
蕭玉蘭
A study of optimal schedule model of the multi-work in the
author_sort Yu-Lan Hsiao
title A study of optimal schedule model of the multi-work in the
title_short A study of optimal schedule model of the multi-work in the
title_full A study of optimal schedule model of the multi-work in the
title_fullStr A study of optimal schedule model of the multi-work in the
title_full_unstemmed A study of optimal schedule model of the multi-work in the
title_sort study of optimal schedule model of the multi-work in the
publishDate 2004
url http://ndltd.ncl.edu.tw/handle/43122052469564486514
work_keys_str_mv AT yulanhsiao astudyofoptimalschedulemodelofthemultiworkinthe
AT xiāoyùlán astudyofoptimalschedulemodelofthemultiworkinthe
AT yulanhsiao dānyīgōngzuòzhànduōxiànggōngzuòpáichéngzuìjiāhuàmóshìjiàngòu
AT xiāoyùlán dānyīgōngzuòzhànduōxiànggōngzuòpáichéngzuìjiāhuàmóshìjiàngòu
AT yulanhsiao studyofoptimalschedulemodelofthemultiworkinthe
AT xiāoyùlán studyofoptimalschedulemodelofthemultiworkinthe
_version_ 1718307575162732544