Single Machine Scheduling Problem with Different Job Release Times

博士 === 國立交通大學 === 工業工程與管理系 === 92 === In an increasingly competitive environment, meeting due date is one of the most important issues that firms need to consider. It is commonly known that when tardy jobs arise, a company may incur tardiness costs, reduce the goodwill and lose future sales. In prac...

Full description

Bibliographic Details
Main Authors: Tzu-Yun Chang, 張子筠
Other Authors: Ching-En Lee
Format: Others
Language:en_US
Published: 2003
Online Access:http://ndltd.ncl.edu.tw/handle/75616561766675789116
id ndltd-TW-092NCTU0031004
record_format oai_dc
spelling ndltd-TW-092NCTU00310042016-06-17T04:16:03Z http://ndltd.ncl.edu.tw/handle/75616561766675789116 Single Machine Scheduling Problem with Different Job Release Times 動態單機排程之研究 Tzu-Yun Chang 張子筠 博士 國立交通大學 工業工程與管理系 92 In an increasingly competitive environment, meeting due date is one of the most important issues that firms need to consider. It is commonly known that when tardy jobs arise, a company may incur tardiness costs, reduce the goodwill and lose future sales. In practice, a firm may give customers different weights of importance, depending on the criteria such as the length of business activities in-between, the frequency with which a customer provides business to the firm, the average percentage of the firm’s capacity filled by a customer’s orders, and the potential of a customer to put orders in the future. The weights of importance often decide the priorities of the customers’ orders in production. What management should do is to minimize the weighted tardiness and the accompanied cost. In this research, heuristic algorithms are proposed to solve the dynamic single machine scheduling problems. The objective is to minimize the total weighted tardiness. There are two sub-problems discussed here. One is to solve the single machine scheduling problem with different jobs release times. The other is to solve the single machine scheduling problem characterized by different job release dates and sequence-dependent setup times. Mathematical programming with logical constraints models are employed to validate the performance of these heuristics. Computational results show that these heuristic scheduling algorithms are practical to solve real word applications. Ching-En Lee Lee-Ing Tong 李慶恩 唐麗英 2003 學位論文 ; thesis 86 en_US
collection NDLTD
language en_US
format Others
sources NDLTD
description 博士 === 國立交通大學 === 工業工程與管理系 === 92 === In an increasingly competitive environment, meeting due date is one of the most important issues that firms need to consider. It is commonly known that when tardy jobs arise, a company may incur tardiness costs, reduce the goodwill and lose future sales. In practice, a firm may give customers different weights of importance, depending on the criteria such as the length of business activities in-between, the frequency with which a customer provides business to the firm, the average percentage of the firm’s capacity filled by a customer’s orders, and the potential of a customer to put orders in the future. The weights of importance often decide the priorities of the customers’ orders in production. What management should do is to minimize the weighted tardiness and the accompanied cost. In this research, heuristic algorithms are proposed to solve the dynamic single machine scheduling problems. The objective is to minimize the total weighted tardiness. There are two sub-problems discussed here. One is to solve the single machine scheduling problem with different jobs release times. The other is to solve the single machine scheduling problem characterized by different job release dates and sequence-dependent setup times. Mathematical programming with logical constraints models are employed to validate the performance of these heuristics. Computational results show that these heuristic scheduling algorithms are practical to solve real word applications.
author2 Ching-En Lee
author_facet Ching-En Lee
Tzu-Yun Chang
張子筠
author Tzu-Yun Chang
張子筠
spellingShingle Tzu-Yun Chang
張子筠
Single Machine Scheduling Problem with Different Job Release Times
author_sort Tzu-Yun Chang
title Single Machine Scheduling Problem with Different Job Release Times
title_short Single Machine Scheduling Problem with Different Job Release Times
title_full Single Machine Scheduling Problem with Different Job Release Times
title_fullStr Single Machine Scheduling Problem with Different Job Release Times
title_full_unstemmed Single Machine Scheduling Problem with Different Job Release Times
title_sort single machine scheduling problem with different job release times
publishDate 2003
url http://ndltd.ncl.edu.tw/handle/75616561766675789116
work_keys_str_mv AT tzuyunchang singlemachineschedulingproblemwithdifferentjobreleasetimes
AT zhāngziyún singlemachineschedulingproblemwithdifferentjobreleasetimes
AT tzuyunchang dòngtàidānjīpáichéngzhīyánjiū
AT zhāngziyún dòngtàidānjīpáichéngzhīyánjiū
_version_ 1718306968823660544