Simulation-based Design Schedule Model Considering Iterations
碩士 === 國立交通大學 === 土木工程系 === 92 ===
Main Authors: | Gilbert Tzong-Shiun Liao, 廖宗信 |
---|---|
Other Authors: | Wei-Chih Wang |
Format: | Others |
Language: | en_US |
Published: |
2003
|
Online Access: | http://ndltd.ncl.edu.tw/handle/84230976032365004289 |
Similar Items
-
Iterative Scheduling Model Analysis and Application
by: Ruey-chyan Guo, et al.
Published: (2007) -
A Fuzzy Optimization Approach to Generation Scheduling Problem Considering Uncertainties
by: Jian-Hao Liao, et al.
Published: (2006) -
Fuzzy Earned Value Management Model Considering The Project Schedule Under Uncertainty
by: Yao-Hsin Chung, et al.
Published: (2013) -
Design of Ordinal Optimization and Simulation-Based Policy Iteration
by: Ming Chen Chang, et al.
Published: (2005) -
Simulation-based scheduling model for multiple design projects
by: Liu, Jang-Jeng, et al.
Published: (2010)