A Study on Solving Flexible Flow-shop and Group Flexible Flow-shop Problems
碩士 === 國立中興大學 === 資訊科學研究所 === 92 === Scheduling is an important process widely used in manufacturing, production, management, computer science, and so on. Finding good schedules for given sets of jobs can thus help factory supervisors effectively control job flows and provide solutions for job seque...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | en_US |
Published: |
2004
|
Online Access: | http://ndltd.ncl.edu.tw/handle/81158695091084203687 |
id |
ndltd-TW-092NCHU0394048 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-092NCHU03940482016-06-17T04:16:22Z http://ndltd.ncl.edu.tw/handle/81158695091084203687 A Study on Solving Flexible Flow-shop and Group Flexible Flow-shop Problems 彈性排程暨群體彈性排程問題解決方案之研究 Pei-Ying Huang 黃珮瑩 碩士 國立中興大學 資訊科學研究所 92 Scheduling is an important process widely used in manufacturing, production, management, computer science, and so on. Finding good schedules for given sets of jobs can thus help factory supervisors effectively control job flows and provide solutions for job sequencing. In simple flow shop problems, each machine operation center includes just one machine. If at least one machine center includes more than one machine, the scheduling problem becomes a flexible flow-shop problem. Scheduling jobs in flexible flow shops is considered an NP-hard problem. Recently, group scheduling has also been proposed and discussed. In the group scheduling, each job belongs to a specific group and all the jobs are processed group by group. A heuristic algorithm for solving flexible flow-shop problems of two machine centers is proposed by Sriskandarajah and Sethi in 1989. In this thesis, we thus adopt and extend their approach to solve flexible flow-shop and group flexible flow-shop scheduling problems. We first propose two methods to solve flexible flow-shop problems with more than two machine centers. The first method deals with a medium number of jobs to get a nearly minimum completion time by combining LPT and dynamic-programming. The second method deals with a large number of jobs to get a nearly minimum completion time by combining LPT and PT. We then propose two methods to solve group flexible flow-shop problems with two machine centers. The first method deals with a small number of jobs to get a minimum completion time by using dynamic-programming. The second method deals with a large number of jobs to get a nearly minimum completion time by combining LPT and Johnson. Furthermore, we also propose several methods to solve group flexible flow-shop problems with more than two machine centers. At last, experiments are made to show the execution times and makespans of the proposed algorithms. The experimental results are totally consistent with our expectation. The choice among these proposed approaches to solve a specific flexible flow-shop problem thus depends on the problem size, the allowed execution time and the allowed error. A trade-off can thus be achieved between accuracy and time complexity. Gwoboa Horng Tzung-Pei Hong 洪國寶 洪宗貝 2004 學位論文 ; thesis 78 en_US |
collection |
NDLTD |
language |
en_US |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立中興大學 === 資訊科學研究所 === 92 === Scheduling is an important process widely used in manufacturing, production, management, computer science, and so on. Finding good schedules for given sets of jobs can thus help factory supervisors effectively control job flows and provide solutions for job sequencing. In simple flow shop problems, each machine operation center includes just one machine. If at least one machine center includes more than one machine, the scheduling problem becomes a flexible flow-shop problem. Scheduling jobs in flexible flow shops is considered an NP-hard problem. Recently, group scheduling has also been proposed and discussed. In the group scheduling, each job belongs to a specific group and all the jobs are processed group by group. A heuristic algorithm for solving flexible flow-shop problems of two machine centers is proposed by Sriskandarajah and Sethi in 1989.
In this thesis, we thus adopt and extend their approach to solve flexible flow-shop and group flexible flow-shop scheduling problems. We first propose two methods to solve flexible flow-shop problems with more than two machine centers. The first method deals with a medium number of jobs to get a nearly minimum completion time by combining LPT and dynamic-programming. The second method deals with a large number of jobs to get a nearly minimum completion time by combining LPT and PT. We then propose two methods to solve group flexible flow-shop problems with two machine centers. The first method deals with a small number of jobs to get a minimum completion time by using dynamic-programming. The second method deals with a large number of jobs to get a nearly minimum completion time by combining LPT and Johnson. Furthermore, we also propose several methods to solve group flexible flow-shop problems with more than two machine centers.
At last, experiments are made to show the execution times and makespans of the proposed algorithms. The experimental results are totally consistent with our expectation. The choice among these proposed approaches to solve a specific flexible flow-shop problem thus depends on the problem size, the allowed execution time and the allowed error. A trade-off can thus be achieved between accuracy and time complexity.
|
author2 |
Gwoboa Horng |
author_facet |
Gwoboa Horng Pei-Ying Huang 黃珮瑩 |
author |
Pei-Ying Huang 黃珮瑩 |
spellingShingle |
Pei-Ying Huang 黃珮瑩 A Study on Solving Flexible Flow-shop and Group Flexible Flow-shop Problems |
author_sort |
Pei-Ying Huang |
title |
A Study on Solving Flexible Flow-shop and Group Flexible Flow-shop Problems |
title_short |
A Study on Solving Flexible Flow-shop and Group Flexible Flow-shop Problems |
title_full |
A Study on Solving Flexible Flow-shop and Group Flexible Flow-shop Problems |
title_fullStr |
A Study on Solving Flexible Flow-shop and Group Flexible Flow-shop Problems |
title_full_unstemmed |
A Study on Solving Flexible Flow-shop and Group Flexible Flow-shop Problems |
title_sort |
study on solving flexible flow-shop and group flexible flow-shop problems |
publishDate |
2004 |
url |
http://ndltd.ncl.edu.tw/handle/81158695091084203687 |
work_keys_str_mv |
AT peiyinghuang astudyonsolvingflexibleflowshopandgroupflexibleflowshopproblems AT huángpèiyíng astudyonsolvingflexibleflowshopandgroupflexibleflowshopproblems AT peiyinghuang dànxìngpáichéngjìqúntǐdànxìngpáichéngwèntíjiějuéfāngànzhīyánjiū AT huángpèiyíng dànxìngpáichéngjìqúntǐdànxìngpáichéngwèntíjiějuéfāngànzhīyánjiū AT peiyinghuang studyonsolvingflexibleflowshopandgroupflexibleflowshopproblems AT huángpèiyíng studyonsolvingflexibleflowshopandgroupflexibleflowshopproblems |
_version_ |
1718307764495712256 |