Summary: | 碩士 === 華梵大學 === 工業管理學系碩士班 === 92 === This proposed research focuses on how to develop an information system which can efficiently solve dynamic re-source allocation problems. Naïve Bayesian Classifier, combined with the method of dynamic planning, was used to solve the proposed problems. Thousands of testing cases were simulated in order to evaluate the performance of proposed research. Total waiting time of demanding points, utility rate of resources, delivery cost, and computational time are performance indices of the proposed system.
|