A Case Study of Constructing the Management Model of Work Plan Execution for IT Department
碩士 === 國立雲林科技大學 === 資訊管理系碩士班 === 91 === Thanks to the progress of technology application of information and communication, the prosperity and development of Internet made competition more drastic to variety of industries which need speed and innovation to survive originally. Our country has become t...
Main Authors: | Bow-Ing Song, 宋伯英 |
---|---|
Other Authors: | Chuen-min Huang |
Format: | Others |
Language: | zh-TW |
Published: |
2003
|
Online Access: | http://ndltd.ncl.edu.tw/handle/37418626101744275644 |
Similar Items
-
An Auxiliary Information SystemCoping with Contract Execution Disputes for Public Construction:Dispute Modulation as an Example
by: Tsay Ing-sheng, et al.
Published: (2001) -
The Balanced Scorecard Construction and Execution – A Case Study Of The Sales Department , Ricoh Taiwan Branch
by: Te-Tsung Hsiao, et al.
Published: (2014) -
Planning construction execution in the engineering pre-construction system
by: Odeta Viliūnienė, et al.
Published: (2011-09-01) -
The Study of Government Department Risk Management Model—An Example of Construction and Planning Agency, Ministry of the Interior
by: Chih-ming Chen, et al.
Published: (2011) -
The Executive Mechanism of the Landscape Master Plan
by: Lin Bo Zhao, et al.
Published: (2006)