A Case Study of Constructing the Management Model of Work Plan Execution for IT Department

碩士 === 國立雲林科技大學 === 資訊管理系碩士班 === 91 === Thanks to the progress of technology application of information and communication, the prosperity and development of Internet made competition more drastic to variety of industries which need speed and innovation to survive originally. Our country has become t...

Full description

Bibliographic Details
Main Authors: Bow-Ing Song, 宋伯英
Other Authors: Chuen-min Huang
Format: Others
Language:zh-TW
Published: 2003
Online Access:http://ndltd.ncl.edu.tw/handle/37418626101744275644
Description
Summary:碩士 === 國立雲林科技大學 === 資訊管理系碩士班 === 91 === Thanks to the progress of technology application of information and communication, the prosperity and development of Internet made competition more drastic to variety of industries which need speed and innovation to survive originally. Our country has become the 144th member of WTO. The domestic traditional manufacturing is facing the strong conflict and worldwide competition. How to make a breakthrough and innovation has become the basic elements for surviving. Workflow control is an important approach of execution, if the traditional manufacturing desires to apply information technology to raise performance and to grasp delivery, quality, and cost. To a computerized manufacturing, most of relevant business flow controls have been executed by information systems. The IT department also cooperates to the goal of management of organization, such as making work plan, supplying information systems or tools to fulfill the requirement of user department, and executing information related affairs which assigned by superordinates. Seeing that of shortening engineering life cycle or other partial improvement, the effect is still limited to the whole organization’s development. This research utilizes case study approach to anatomize the current status of work plan execution about IT department of a certain manufacturing deeply. Use IDEF family methods to construct management model. Use IDEF0 to anatomize current (AS-IS) operation functions, and bring up improvement scheme for future (TO-BE) about function model. Use IDEF3 to proceed the process rationalization review. And finally use IDEF1X to construct data model. Expect to build more effective management model about work plan execution. The research result has been reviewed and deliberated with the manager of IT department of the case company, it can substantially raise the work plan managerial performance, save the manpower and time of summarization sponsor, and assist the manager to strengthen the ability of work execution control and management.