Fuzzy Theory Application in System of Qaulity Assessment on Construction –case study on System of Assessment for Supplier,WRA,MOEA

碩士 === 靜宜大學 === 會計學系研究所 === 91 === The Water Resources Agency, Ministry of Economic Affairs had been implementing the project,” System of Assessment for Supplier” since 1993. Various altercations were modified in 1997 and 1998. Due to the reorganization of Water Resources Agency, the regulations, an...

Full description

Bibliographic Details
Main Authors: Ai-Erh Chen, 陳愛兒
Other Authors: none
Format: Others
Language:zh-TW
Published: 2003
Online Access:http://ndltd.ncl.edu.tw/handle/67715034268664124626
id ndltd-TW-091PU005385012
record_format oai_dc
spelling ndltd-TW-091PU0053850122015-10-13T13:35:29Z http://ndltd.ncl.edu.tw/handle/67715034268664124626 Fuzzy Theory Application in System of Qaulity Assessment on Construction –case study on System of Assessment for Supplier,WRA,MOEA 模糊理論應用於工程品質評鑑制度-以經濟部水利署「承包商施工評鑑制度」為例 Ai-Erh Chen 陳愛兒 碩士 靜宜大學 會計學系研究所 91 The Water Resources Agency, Ministry of Economic Affairs had been implementing the project,” System of Assessment for Supplier” since 1993. Various altercations were modified in 1997 and 1998. Due to the reorganization of Water Resources Agency, the regulations, and the constantly changing construction environment, it is impractical to enforce the obsolete “System of Assessment for Supplier “. Researches towards the related issues discovered that the greatest number of subjects being concentrated on the contents of the assessing items and their ratios of weight. One of the research projects has pointed out that after repeated evaluations of “Assessment of construction”, an irregularity award adding extra points has occurred. This inspired my case study on “application of fuzzy theory in system of quality assessment on construction “ to evaluate the results, the fairness, and the objectivity of its repeated evaluation of the assessment system. Based on my study, using the fuzzy theory mathematical method, I have found out the different classes of the subcontractor’s assessment construction. I analyzed and compared that with the Water Resources Agency Assessment. The result is that a repeated evaluation award adding extra points could be existed. Also, the calculating methods make it more deviated from the right path. To achieve the goal of fairness and objectivity, the only way is to mend the current “Assessment system” method of calculation. Instead, we should use more scientific theories to award the good subcontractors to achieve the purposes of quality assessment on construction. none none 黃劭彥 沈維民 2003 學位論文 ; thesis 109 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 靜宜大學 === 會計學系研究所 === 91 === The Water Resources Agency, Ministry of Economic Affairs had been implementing the project,” System of Assessment for Supplier” since 1993. Various altercations were modified in 1997 and 1998. Due to the reorganization of Water Resources Agency, the regulations, and the constantly changing construction environment, it is impractical to enforce the obsolete “System of Assessment for Supplier “. Researches towards the related issues discovered that the greatest number of subjects being concentrated on the contents of the assessing items and their ratios of weight. One of the research projects has pointed out that after repeated evaluations of “Assessment of construction”, an irregularity award adding extra points has occurred. This inspired my case study on “application of fuzzy theory in system of quality assessment on construction “ to evaluate the results, the fairness, and the objectivity of its repeated evaluation of the assessment system. Based on my study, using the fuzzy theory mathematical method, I have found out the different classes of the subcontractor’s assessment construction. I analyzed and compared that with the Water Resources Agency Assessment. The result is that a repeated evaluation award adding extra points could be existed. Also, the calculating methods make it more deviated from the right path. To achieve the goal of fairness and objectivity, the only way is to mend the current “Assessment system” method of calculation. Instead, we should use more scientific theories to award the good subcontractors to achieve the purposes of quality assessment on construction.
author2 none
author_facet none
Ai-Erh Chen
陳愛兒
author Ai-Erh Chen
陳愛兒
spellingShingle Ai-Erh Chen
陳愛兒
Fuzzy Theory Application in System of Qaulity Assessment on Construction –case study on System of Assessment for Supplier,WRA,MOEA
author_sort Ai-Erh Chen
title Fuzzy Theory Application in System of Qaulity Assessment on Construction –case study on System of Assessment for Supplier,WRA,MOEA
title_short Fuzzy Theory Application in System of Qaulity Assessment on Construction –case study on System of Assessment for Supplier,WRA,MOEA
title_full Fuzzy Theory Application in System of Qaulity Assessment on Construction –case study on System of Assessment for Supplier,WRA,MOEA
title_fullStr Fuzzy Theory Application in System of Qaulity Assessment on Construction –case study on System of Assessment for Supplier,WRA,MOEA
title_full_unstemmed Fuzzy Theory Application in System of Qaulity Assessment on Construction –case study on System of Assessment for Supplier,WRA,MOEA
title_sort fuzzy theory application in system of qaulity assessment on construction –case study on system of assessment for supplier,wra,moea
publishDate 2003
url http://ndltd.ncl.edu.tw/handle/67715034268664124626
work_keys_str_mv AT aierhchen fuzzytheoryapplicationinsystemofqaulityassessmentonconstructioncasestudyonsystemofassessmentforsupplierwramoea
AT chénàiér fuzzytheoryapplicationinsystemofqaulityassessmentonconstructioncasestudyonsystemofassessmentforsupplierwramoea
AT aierhchen móhúlǐlùnyīngyòngyúgōngchéngpǐnzhìpíngjiànzhìdùyǐjīngjìbùshuǐlìshǔchéngbāoshāngshīgōngpíngjiànzhìdùwèilì
AT chénàiér móhúlǐlùnyīngyòngyúgōngchéngpǐnzhìpíngjiànzhìdùyǐjīngjìbùshuǐlìshǔchéngbāoshāngshīgōngpíngjiànzhìdùwèilì
_version_ 1717737553217454080