Fuzzy Theory Application in System of Qaulity Assessment on Construction –case study on System of Assessment for Supplier,WRA,MOEA

碩士 === 靜宜大學 === 會計學系研究所 === 91 === The Water Resources Agency, Ministry of Economic Affairs had been implementing the project,” System of Assessment for Supplier” since 1993. Various altercations were modified in 1997 and 1998. Due to the reorganization of Water Resources Agency, the regulations, an...

Full description

Bibliographic Details
Main Authors: Ai-Erh Chen, 陳愛兒
Other Authors: none
Format: Others
Language:zh-TW
Published: 2003
Online Access:http://ndltd.ncl.edu.tw/handle/67715034268664124626
Description
Summary:碩士 === 靜宜大學 === 會計學系研究所 === 91 === The Water Resources Agency, Ministry of Economic Affairs had been implementing the project,” System of Assessment for Supplier” since 1993. Various altercations were modified in 1997 and 1998. Due to the reorganization of Water Resources Agency, the regulations, and the constantly changing construction environment, it is impractical to enforce the obsolete “System of Assessment for Supplier “. Researches towards the related issues discovered that the greatest number of subjects being concentrated on the contents of the assessing items and their ratios of weight. One of the research projects has pointed out that after repeated evaluations of “Assessment of construction”, an irregularity award adding extra points has occurred. This inspired my case study on “application of fuzzy theory in system of quality assessment on construction “ to evaluate the results, the fairness, and the objectivity of its repeated evaluation of the assessment system. Based on my study, using the fuzzy theory mathematical method, I have found out the different classes of the subcontractor’s assessment construction. I analyzed and compared that with the Water Resources Agency Assessment. The result is that a repeated evaluation award adding extra points could be existed. Also, the calculating methods make it more deviated from the right path. To achieve the goal of fairness and objectivity, the only way is to mend the current “Assessment system” method of calculation. Instead, we should use more scientific theories to award the good subcontractors to achieve the purposes of quality assessment on construction.