Activity-Based Costing System for Engineering Project Costing

碩士 === 國立臺灣科技大學 === 工業管理系 === 91 === Due to the changing business environment, every business has faced the challenger coming from all over the world without any business can survive only depend on the domestic market. Because that enterprises make every effort for reducing lead time、impr...

Full description

Bibliographic Details
Main Authors: Lin, Shih Hao, 林世豪
Other Authors: Yang, Wen-Dwo
Format: Others
Language:zh-TW
Published: 2002
Online Access:http://ndltd.ncl.edu.tw/handle/78170666844562888221
id ndltd-TW-091NTUST041006
record_format oai_dc
spelling ndltd-TW-091NTUST0410062016-06-20T04:15:59Z http://ndltd.ncl.edu.tw/handle/78170666844562888221 Activity-Based Costing System for Engineering Project Costing 工程專案導入作業基礎成本法之研究-以個案公司為例 Lin, Shih Hao 林世豪 碩士 國立臺灣科技大學 工業管理系 91 Due to the changing business environment, every business has faced the challenger coming from all over the world without any business can survive only depend on the domestic market. Because that enterprises make every effort for reducing lead time、improving quality、cost down ..etc., These activities are crucial for upgrade competence. In this competitive environment, enterprises need an advanced performance measurement system which can forecast and measure the gap between goal and current action, cooperate with competitive strategy、costing system and assist enterprises creating competence. Activity-based costing system has been approved for activities linkage, ranking the performance of using resources inter-company. Therefore compare with conventional costing system, ABC costing system is proper for enterprise to measure performance in case linked with many cross functional activities. The purpose of this study is using ABC costing system to build a model for future application in the engineering project field and plan to create a system for measuring resources consumption during multi-activities. This system will be a fundamental for further business process re-engineering (BPR) and continuous improvement activities, so enterprise upgrade the competence. Yang, Wen-Dwo 楊文鐸 2002 學位論文 ; thesis 0 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺灣科技大學 === 工業管理系 === 91 === Due to the changing business environment, every business has faced the challenger coming from all over the world without any business can survive only depend on the domestic market. Because that enterprises make every effort for reducing lead time、improving quality、cost down ..etc., These activities are crucial for upgrade competence. In this competitive environment, enterprises need an advanced performance measurement system which can forecast and measure the gap between goal and current action, cooperate with competitive strategy、costing system and assist enterprises creating competence. Activity-based costing system has been approved for activities linkage, ranking the performance of using resources inter-company. Therefore compare with conventional costing system, ABC costing system is proper for enterprise to measure performance in case linked with many cross functional activities. The purpose of this study is using ABC costing system to build a model for future application in the engineering project field and plan to create a system for measuring resources consumption during multi-activities. This system will be a fundamental for further business process re-engineering (BPR) and continuous improvement activities, so enterprise upgrade the competence.
author2 Yang, Wen-Dwo
author_facet Yang, Wen-Dwo
Lin, Shih Hao
林世豪
author Lin, Shih Hao
林世豪
spellingShingle Lin, Shih Hao
林世豪
Activity-Based Costing System for Engineering Project Costing
author_sort Lin, Shih Hao
title Activity-Based Costing System for Engineering Project Costing
title_short Activity-Based Costing System for Engineering Project Costing
title_full Activity-Based Costing System for Engineering Project Costing
title_fullStr Activity-Based Costing System for Engineering Project Costing
title_full_unstemmed Activity-Based Costing System for Engineering Project Costing
title_sort activity-based costing system for engineering project costing
publishDate 2002
url http://ndltd.ncl.edu.tw/handle/78170666844562888221
work_keys_str_mv AT linshihhao activitybasedcostingsystemforengineeringprojectcosting
AT línshìháo activitybasedcostingsystemforengineeringprojectcosting
AT linshihhao gōngchéngzhuānàndǎorùzuòyèjīchǔchéngběnfǎzhīyánjiūyǐgèàngōngsīwèilì
AT línshìháo gōngchéngzhuānàndǎorùzuòyèjīchǔchéngběnfǎzhīyánjiūyǐgèàngōngsīwèilì
_version_ 1718311101183033344