Activity-Based Costing System for Engineering Project Costing
碩士 === 國立臺灣科技大學 === 工業管理系 === 91 === Due to the changing business environment, every business has faced the challenger coming from all over the world without any business can survive only depend on the domestic market. Because that enterprises make every effort for reducing lead time、impr...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2002
|
Online Access: | http://ndltd.ncl.edu.tw/handle/78170666844562888221 |
id |
ndltd-TW-091NTUST041006 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-091NTUST0410062016-06-20T04:15:59Z http://ndltd.ncl.edu.tw/handle/78170666844562888221 Activity-Based Costing System for Engineering Project Costing 工程專案導入作業基礎成本法之研究-以個案公司為例 Lin, Shih Hao 林世豪 碩士 國立臺灣科技大學 工業管理系 91 Due to the changing business environment, every business has faced the challenger coming from all over the world without any business can survive only depend on the domestic market. Because that enterprises make every effort for reducing lead time、improving quality、cost down ..etc., These activities are crucial for upgrade competence. In this competitive environment, enterprises need an advanced performance measurement system which can forecast and measure the gap between goal and current action, cooperate with competitive strategy、costing system and assist enterprises creating competence. Activity-based costing system has been approved for activities linkage, ranking the performance of using resources inter-company. Therefore compare with conventional costing system, ABC costing system is proper for enterprise to measure performance in case linked with many cross functional activities. The purpose of this study is using ABC costing system to build a model for future application in the engineering project field and plan to create a system for measuring resources consumption during multi-activities. This system will be a fundamental for further business process re-engineering (BPR) and continuous improvement activities, so enterprise upgrade the competence. Yang, Wen-Dwo 楊文鐸 2002 學位論文 ; thesis 0 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立臺灣科技大學 === 工業管理系 === 91 === Due to the changing business environment, every business has faced the challenger coming from all over the world without any business can survive only depend on the domestic market. Because that enterprises make every effort for reducing lead time、improving quality、cost down ..etc., These activities are crucial for upgrade competence.
In this competitive environment, enterprises need an advanced performance measurement system which can forecast and measure the gap between goal and current action, cooperate with competitive strategy、costing system and assist enterprises creating competence. Activity-based costing system has been approved for activities linkage, ranking the performance of using resources inter-company. Therefore compare with conventional costing system, ABC costing system is proper for enterprise to measure performance in case linked with many cross functional activities.
The purpose of this study is using ABC costing system to build a model for future application in the engineering project field and plan to create a system for measuring resources consumption during multi-activities. This system will be a fundamental for further business process re-engineering (BPR) and continuous improvement activities, so enterprise upgrade the competence.
|
author2 |
Yang, Wen-Dwo |
author_facet |
Yang, Wen-Dwo Lin, Shih Hao 林世豪 |
author |
Lin, Shih Hao 林世豪 |
spellingShingle |
Lin, Shih Hao 林世豪 Activity-Based Costing System for Engineering Project Costing |
author_sort |
Lin, Shih Hao |
title |
Activity-Based Costing System for Engineering Project Costing |
title_short |
Activity-Based Costing System for Engineering Project Costing |
title_full |
Activity-Based Costing System for Engineering Project Costing |
title_fullStr |
Activity-Based Costing System for Engineering Project Costing |
title_full_unstemmed |
Activity-Based Costing System for Engineering Project Costing |
title_sort |
activity-based costing system for engineering project costing |
publishDate |
2002 |
url |
http://ndltd.ncl.edu.tw/handle/78170666844562888221 |
work_keys_str_mv |
AT linshihhao activitybasedcostingsystemforengineeringprojectcosting AT línshìháo activitybasedcostingsystemforengineeringprojectcosting AT linshihhao gōngchéngzhuānàndǎorùzuòyèjīchǔchéngběnfǎzhīyánjiūyǐgèàngōngsīwèilì AT línshìháo gōngchéngzhuānàndǎorùzuòyèjīchǔchéngběnfǎzhīyánjiūyǐgèàngōngsīwèilì |
_version_ |
1718311101183033344 |