Study on managemant and recycle of metropolitan residual earthwork and construction waste

碩士 === 國立中央大學 === 土木工程學系碩士在職專班 === 91 === It has been ten years since the conflict between Taipei city and Taipei county sets off the problem of construct earthwork in 1993.This problem did persist not only in Taipei metropolitan area but also occurred nation-wide except the eastern part of this isl...

Full description

Bibliographic Details
Main Authors: Chih-Feng Huang, 黃治峰
Other Authors: Chih-Tung Lin
Format: Others
Language:zh-TW
Published: 2003
Online Access:http://ndltd.ncl.edu.tw/handle/08540010334153796999
Description
Summary:碩士 === 國立中央大學 === 土木工程學系碩士在職專班 === 91 === It has been ten years since the conflict between Taipei city and Taipei county sets off the problem of construct earthwork in 1993.This problem did persist not only in Taipei metropolitan area but also occurred nation-wide except the eastern part of this island. It is more serious in some areas. Some environment and scenery are destroyed and public securities are endangered. Central government is obliged to face this affair seriously. The President of Executive Yuan ordered the Committee of Public Construction to establish a coordinating group for overriding the city and county in northern Taiwan. Also another coordinating group for construction residual earthwork was established in Ministry of Interior. The achievement was not evident even though those overriding group were responsible to handle the residual earthwork problems. The problem still exists and also becomes the obstacle for enforcement of construction projects. Some public empolyee were sent to jail owing to the mishandling of residual earthwork. The faces of those who work in the field of construction paled with fear when talked about the earthwork. Unable to solve residual earthwork problems has become a laughingstock in Taiwan especially the island is surrounded by sea. This issue does exist and worth researching. Unable to solve residual earthwork accompanying the earthquake occurred on Sep. 21, 1999 with the demolishment of old structures due to development of city all make the damage of the environment and leave disaster to our descendant. On this project, developed countries have a series of immaculate rules and scheme for management. The governments have precise functions and duties of organization. The punishment to those who violate the regulations is severe and thorough. Reuse of the residual resources of construction successfully solves the problem formlessly. This experience can be learned by us. Management of residual earthwork and construction waste is inevitable. The utilization of residual and waste is the trend of the world and able to reduce the exhaustion of natural resources. It can not be delayed. This research approaches the issue from different respects, technique, economy, environment, and hope the proposition of strategy could make some contribution.