Case study of surface settlement due to tunneling construction

碩士 === 國立中央大學 === 土木工程學系碩士在職專班 === 91 === ABSTRACT Because of the soil stress release from the face of excavation, some surface settlement was created during the period of tunneling construction. Historic cases indicated that the surface settlement is inevitable. Since the surface settlement is in...

Full description

Bibliographic Details
Main Authors: yu-yi Chang, 張有毅
Other Authors: none
Format: Others
Language:zh-TW
Published: 2003
Online Access:http://ndltd.ncl.edu.tw/handle/07436423707079719267