The Study on the Construction Performance Evaluation of Tunnel Project using the New Austrian Tunneling Method
碩士 === 國立中央大學 === 土木工程學系碩士在職專班 === 91 === Taiwan tunnel projects form a bottle neck because of the geological variety encountered. Because of the specific know-how requirements and the difficulty, the construction quality and cost control need to be given more attention. The contractor, supervisor...
Main Authors: | Wen-Zen Kuo, 郭文仁 |
---|---|
Other Authors: | Jyh-Dong Lin |
Format: | Others |
Language: | zh-TW |
Published: |
2003
|
Online Access: | http://ndltd.ncl.edu.tw/handle/00040358215074374704 |
Similar Items
-
Useful concepts for application of new Austrian tunnelling method in tunnel construction (NATM)
by: Jovčlć Vojkan, et al.
Published: (2015-01-01) -
Evaluation of new Austrian tunnelling method applied to Bolu tunnel's weak rocks
by: Ebu Bekir Aygar
Published: (2020-06-01) -
An appraisal of the New Austrian Tunnelling Method in soil and weak rock
by: Bowers, Keith Henry
Published: (1997) -
From the new Austrian tunneling method to the geoengineering condition evaluation and dynamic controlling method
by: Yanjun Shang, et al.
Published: (2014-08-01) -
Numerical evaluation of new Austrian tunneling method excavation sequences: A case study
by: Hafeezur Rehman, et al.
Published: (2020-05-01)