The Intelligent Agent Based Subcontracting and Prequalification System on Construction Supply Chain Procurement
碩士 === 國立交通大學 === 土木工程系 === 91 === Owing to the trend of growing scale and specialization of the construction projects, the construction firms especially with multiple projects have to analysis the state of resources and the profit in order to subcontract the project at hand in a limited duration of...
Main Authors: | Wei-Hau Sung, 宋偉豪 |
---|---|
Other Authors: | Ren-Jye Dzeng |
Format: | Others |
Language: | zh-TW |
Published: |
2003
|
Online Access: | http://ndltd.ncl.edu.tw/handle/16921554845405860119 |
Similar Items
-
Effectiveness of Prequalification Practices in Public Procurement
by: Berjis, Payman
Published: (2012) -
Effectiveness of Prequalification Practices in Public Procurement
by: Berjis, Payman
Published: (2012) -
An Accelerated Subcontracting And Procuring (ASAP) Model for Construction Projects
by: Pao-Hung Lin, et al.
Published: (2001) -
The Supplying Chain Scheduling with the Cost Constraint and Subcontracting
by: Guo Sun, et al.
Published: (2014-01-01) -
Research on Contractor Prequalification System for Public Construction
by: Chen Ya-Chi, et al.
Published: (1998)