Investigation of the “Technical Database Integration Program for Public Construction Works”

碩士 === 國立交通大學 === 土木工程系 === 91 === In the recent years, Taiwanese government energetically has promoted several major construction projects. According to the schemes issued by the Executive Yuan in 1995, the Public construction Commission (PCC) started a serious of fundamental, integrated, and inte...

Full description

Bibliographic Details
Main Authors: Yi-Ming Lu, 呂翊民
Other Authors: Wei-Chih Wang
Format: Others
Language:zh-TW
Published: 2003
Online Access:http://ndltd.ncl.edu.tw/handle/88336029118877342878
id ndltd-TW-091NCTU0015008
record_format oai_dc
spelling ndltd-TW-091NCTU00150082016-06-22T04:14:04Z http://ndltd.ncl.edu.tw/handle/88336029118877342878 Investigation of the “Technical Database Integration Program for Public Construction Works” 「公共工程技術資料庫整合計畫」整合性之探討 Yi-Ming Lu 呂翊民 碩士 國立交通大學 土木工程系 91 In the recent years, Taiwanese government energetically has promoted several major construction projects. According to the schemes issued by the Executive Yuan in 1995, the Public construction Commission (PCC) started a serious of fundamental, integrated, and interrelated plans on the “Technical Database Integration Program for Public Construction Works (or termed as four-in-one plan)”. Under this integration program, each plan must horizontally and vertically connect to the other so that the program can work effectively. While the government has actively promoted this program, practitioners have criticized this four-in-one plan and argued that this program cannot support the project tendering efficiently. The objectives of this study are to in-depthly analyze the workability of these programs individually and integratedly. Such an analysis is performed by using a questionnaire survey and the Data Flow Diagrams (DFD) technique. The analysis results reveal that several drawbacks can be found in the horizontal integration between these programs. To overcome these drawbacks, this investigation further uses the DFD technique to develop an information flow model to improve the current four-in-one plan. The improved plan is expected to work successfully in generating the project tendering packages (including design plans, specifications, and estimation) automatically. The research results are demonstrated by an example of “cantilever retaining wall” construction project. Wei-Chih Wang 王維志 2003 學位論文 ; thesis 157 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立交通大學 === 土木工程系 === 91 === In the recent years, Taiwanese government energetically has promoted several major construction projects. According to the schemes issued by the Executive Yuan in 1995, the Public construction Commission (PCC) started a serious of fundamental, integrated, and interrelated plans on the “Technical Database Integration Program for Public Construction Works (or termed as four-in-one plan)”. Under this integration program, each plan must horizontally and vertically connect to the other so that the program can work effectively. While the government has actively promoted this program, practitioners have criticized this four-in-one plan and argued that this program cannot support the project tendering efficiently. The objectives of this study are to in-depthly analyze the workability of these programs individually and integratedly. Such an analysis is performed by using a questionnaire survey and the Data Flow Diagrams (DFD) technique. The analysis results reveal that several drawbacks can be found in the horizontal integration between these programs. To overcome these drawbacks, this investigation further uses the DFD technique to develop an information flow model to improve the current four-in-one plan. The improved plan is expected to work successfully in generating the project tendering packages (including design plans, specifications, and estimation) automatically. The research results are demonstrated by an example of “cantilever retaining wall” construction project.
author2 Wei-Chih Wang
author_facet Wei-Chih Wang
Yi-Ming Lu
呂翊民
author Yi-Ming Lu
呂翊民
spellingShingle Yi-Ming Lu
呂翊民
Investigation of the “Technical Database Integration Program for Public Construction Works”
author_sort Yi-Ming Lu
title Investigation of the “Technical Database Integration Program for Public Construction Works”
title_short Investigation of the “Technical Database Integration Program for Public Construction Works”
title_full Investigation of the “Technical Database Integration Program for Public Construction Works”
title_fullStr Investigation of the “Technical Database Integration Program for Public Construction Works”
title_full_unstemmed Investigation of the “Technical Database Integration Program for Public Construction Works”
title_sort investigation of the “technical database integration program for public construction works”
publishDate 2003
url http://ndltd.ncl.edu.tw/handle/88336029118877342878
work_keys_str_mv AT yiminglu investigationofthetechnicaldatabaseintegrationprogramforpublicconstructionworks
AT lǚyìmín investigationofthetechnicaldatabaseintegrationprogramforpublicconstructionworks
AT yiminglu gōnggònggōngchéngjìshùzīliàokùzhěnghéjìhuàzhěnghéxìngzhītàntǎo
AT lǚyìmín gōnggònggōngchéngjìshùzīliàokùzhěnghéjìhuàzhěnghéxìngzhītàntǎo
_version_ 1718314770704105472