The Study of Reparation and Enhancement Method for Reinforced Concrete Smokestack Structure

碩士 === 國立中興大學 === 土木工程學系 === 91 === Abstract This study case is to discuss the cracking examination, sampling test, the enhancement and reparation construction method for reionforced concrete smokestack structure. In this study, we adopt the reparation and enhancement case of the first an...

Full description

Bibliographic Details
Main Authors: Peng Shyh-Min, 彭世民
Other Authors: Chang Ming-Tian
Format: Others
Language:zh-TW
Published: 2003
Online Access:http://ndltd.ncl.edu.tw/handle/14464139805826491786
id ndltd-TW-091NCHU0015095
record_format oai_dc
spelling ndltd-TW-091NCHU00150952015-10-13T17:01:58Z http://ndltd.ncl.edu.tw/handle/14464139805826491786 The Study of Reparation and Enhancement Method for Reinforced Concrete Smokestack Structure 鋼筋混凝土煙囪結構物維修補強方法研究(台灣電力公司協和火力發電廠第1、2號機煙囪維修補強案為例) Peng Shyh-Min 彭世民 碩士 國立中興大學 土木工程學系 91 Abstract This study case is to discuss the cracking examination, sampling test, the enhancement and reparation construction method for reionforced concrete smokestack structure. In this study, we adopt the reparation and enhancement case of the first and second machine smokestack in Hsieh Ho Thermal Power Plant of Taiwan Power Company as the study case. In which, its construction examination and measurement process, the points differ from the reparation case in general, its advantages and defects are discussed. With the study case of the smokestack reparation of Taiwan Power Company, we carry out the following tests and measurements: (1) the current condition examination of tube-shaped smokestack structure, (2) core boring sampling for the compressive strength test of concrete, neutralization test of hard and solid concrete and the test of chlorine ion content, (3) estimating the cracking process of concrete and the countermeasures for the reparation and reinforcement. Roughly from each kind of test and measurement results, it is seen that the reinforcing bars of tube-shaped smokestack is only slightly corroded and its impact degree on the safety of the whole construction is not significant. After the reparation and enhancement construction, the safety degree of the whole smokestack strudture is heightened. Only the original check method of this case is not executed according to the standard procedures, such as traditional investigation, diagnosis estimation, reparation and reinforcement design, reparation and reinforcement construction and etc, and subsequently, serious concrete cracking on two circular areas are discovered, where the overall check and measurement, and safety estimation should be executed. And this causes the delay in the time limit for the project. Chang Ming-Tian 張 明 添 2003 學位論文 ; thesis 96 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立中興大學 === 土木工程學系 === 91 === Abstract This study case is to discuss the cracking examination, sampling test, the enhancement and reparation construction method for reionforced concrete smokestack structure. In this study, we adopt the reparation and enhancement case of the first and second machine smokestack in Hsieh Ho Thermal Power Plant of Taiwan Power Company as the study case. In which, its construction examination and measurement process, the points differ from the reparation case in general, its advantages and defects are discussed. With the study case of the smokestack reparation of Taiwan Power Company, we carry out the following tests and measurements: (1) the current condition examination of tube-shaped smokestack structure, (2) core boring sampling for the compressive strength test of concrete, neutralization test of hard and solid concrete and the test of chlorine ion content, (3) estimating the cracking process of concrete and the countermeasures for the reparation and reinforcement. Roughly from each kind of test and measurement results, it is seen that the reinforcing bars of tube-shaped smokestack is only slightly corroded and its impact degree on the safety of the whole construction is not significant. After the reparation and enhancement construction, the safety degree of the whole smokestack strudture is heightened. Only the original check method of this case is not executed according to the standard procedures, such as traditional investigation, diagnosis estimation, reparation and reinforcement design, reparation and reinforcement construction and etc, and subsequently, serious concrete cracking on two circular areas are discovered, where the overall check and measurement, and safety estimation should be executed. And this causes the delay in the time limit for the project.
author2 Chang Ming-Tian
author_facet Chang Ming-Tian
Peng Shyh-Min
彭世民
author Peng Shyh-Min
彭世民
spellingShingle Peng Shyh-Min
彭世民
The Study of Reparation and Enhancement Method for Reinforced Concrete Smokestack Structure
author_sort Peng Shyh-Min
title The Study of Reparation and Enhancement Method for Reinforced Concrete Smokestack Structure
title_short The Study of Reparation and Enhancement Method for Reinforced Concrete Smokestack Structure
title_full The Study of Reparation and Enhancement Method for Reinforced Concrete Smokestack Structure
title_fullStr The Study of Reparation and Enhancement Method for Reinforced Concrete Smokestack Structure
title_full_unstemmed The Study of Reparation and Enhancement Method for Reinforced Concrete Smokestack Structure
title_sort study of reparation and enhancement method for reinforced concrete smokestack structure
publishDate 2003
url http://ndltd.ncl.edu.tw/handle/14464139805826491786
work_keys_str_mv AT pengshyhmin thestudyofreparationandenhancementmethodforreinforcedconcretesmokestackstructure
AT péngshìmín thestudyofreparationandenhancementmethodforreinforcedconcretesmokestackstructure
AT pengshyhmin gāngjīnhùnníngtǔyāncōngjiégòuwùwéixiūbǔqiángfāngfǎyánjiūtáiwāndiànlìgōngsīxiéhéhuǒlìfādiànchǎngdì12hàojīyāncōngwéixiūbǔqiángànwèilì
AT péngshìmín gāngjīnhùnníngtǔyāncōngjiégòuwùwéixiūbǔqiángfāngfǎyánjiūtáiwāndiànlìgōngsīxiéhéhuǒlìfādiànchǎngdì12hàojīyāncōngwéixiūbǔqiángànwèilì
AT pengshyhmin studyofreparationandenhancementmethodforreinforcedconcretesmokestackstructure
AT péngshìmín studyofreparationandenhancementmethodforreinforcedconcretesmokestackstructure
_version_ 1717779236581801984