On the Pumping System of Buildings

碩士 === 逢甲大學 === 土木及水利工程所 === 91 === In this thesis, the fundamental theorem and the evolution of the design procedure for the pumping system of buildings are reviewed, discussed and assessed. The advantages and disadvantages of the new design procedure of the Taiwan Water Supply Corporation are con...

Full description

Bibliographic Details
Main Authors: Jui-Jung Huang, 黃瑞榮
Other Authors: Shian-Woei Jeng
Format: Others
Language:zh-TW
Published: 2003
Online Access:http://ndltd.ncl.edu.tw/handle/akecke
id ndltd-TW-091FCU05017019
record_format oai_dc
spelling ndltd-TW-091FCU050170192018-06-25T06:06:27Z http://ndltd.ncl.edu.tw/handle/akecke On the Pumping System of Buildings 建築物抽水管路系統之設計方法 Jui-Jung Huang 黃瑞榮 碩士 逢甲大學 土木及水利工程所 91 In this thesis, the fundamental theorem and the evolution of the design procedure for the pumping system of buildings are reviewed, discussed and assessed. The advantages and disadvantages of the new design procedure of the Taiwan Water Supply Corporation are concluded, and the modification methods for the disadvantages are also given. Two sets of practical examples are used to show the blind spots of the general consulting firms. It is found that (1)the commercial pipe diameter should be carefully selected in a right way, (2)Jeng and Cheng’s formula for the ratio of the pumping head to the elevation head is accurate and strongly recommended, and (3)the system design procedure, given in the thesis, should be very helpful for the design work. Shian-Woei Jeng 鄭仙偉 2003 學位論文 ; thesis 145 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 逢甲大學 === 土木及水利工程所 === 91 === In this thesis, the fundamental theorem and the evolution of the design procedure for the pumping system of buildings are reviewed, discussed and assessed. The advantages and disadvantages of the new design procedure of the Taiwan Water Supply Corporation are concluded, and the modification methods for the disadvantages are also given. Two sets of practical examples are used to show the blind spots of the general consulting firms. It is found that (1)the commercial pipe diameter should be carefully selected in a right way, (2)Jeng and Cheng’s formula for the ratio of the pumping head to the elevation head is accurate and strongly recommended, and (3)the system design procedure, given in the thesis, should be very helpful for the design work.
author2 Shian-Woei Jeng
author_facet Shian-Woei Jeng
Jui-Jung Huang
黃瑞榮
author Jui-Jung Huang
黃瑞榮
spellingShingle Jui-Jung Huang
黃瑞榮
On the Pumping System of Buildings
author_sort Jui-Jung Huang
title On the Pumping System of Buildings
title_short On the Pumping System of Buildings
title_full On the Pumping System of Buildings
title_fullStr On the Pumping System of Buildings
title_full_unstemmed On the Pumping System of Buildings
title_sort on the pumping system of buildings
publishDate 2003
url http://ndltd.ncl.edu.tw/handle/akecke
work_keys_str_mv AT juijunghuang onthepumpingsystemofbuildings
AT huángruìróng onthepumpingsystemofbuildings
AT juijunghuang jiànzhúwùchōushuǐguǎnlùxìtǒngzhīshèjìfāngfǎ
AT huángruìróng jiànzhúwùchōushuǐguǎnlùxìtǒngzhīshèjìfāngfǎ
_version_ 1718706238347280384