The Impact Analysis and Relative Counterplot of Organization Change Against the Project Management Mechanism-The Case of Study the Engineering System of Construction&Planning Administration
碩士 === 朝陽科技大學 === 營建工程系碩士班 === 91 === ABSTRACT To solve this problem and difficulty, the “specialized construction management” (also known as “project management”) has become a method and trend to all of the construction sponsoring agencies. In order to realize the impact against the construction m...
Main Authors: | Ching-Liang Wang, 王清良 |
---|---|
Other Authors: | NAI-HSIN PAN |
Format: | Others |
Language: | zh-TW |
Published: |
2003
|
Online Access: | http://ndltd.ncl.edu.tw/handle/cwtxu6 |
Similar Items
-
The Mentality, Actual State and Counterplot of Nowadays School Bullying
by: Yi-Ling Kuo, et al.
Published: (2014) -
The Check and Counterplot to the Loop of CopperCable When ADSL Appears Obstacles
by: Haw-Chung Li, et al.
Published: (2003) -
Causes and Control Responses of Budget Changes in Electro-Mechanical Engineering for Building Construction Projects
by: Chien-Liang Liu, et al.
Published: (2019) -
A STUDY ON ORGANIZATION ADJUSTMENT PROJECTS OF TOWN AND COUNTRY PLANNING BUREAU OF CONSTRUCTION AND PLANNING ADMINISTRATION
by: Wen Chih-Wei, et al.
Published: (2000) -
on constructing the learning organization of the administrative institution
by: wong ching cheng, et al.
Published: (2002)