A study of the project time/cost tradeoff problem optimization using Tabu search algorithm
碩士 === 朝陽科技大學 === 營建工程系碩士班 === 91 === There are two objectives on the construction project resource scheduling: (1) to let all of the activities get their resources and then complete the works before the required finish date considering cost problem;(2) to make resource allocation and utilization ef...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2003
|
Online Access: | http://ndltd.ncl.edu.tw/handle/xsa2en |
id |
ndltd-TW-091CYUT5582023 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-091CYUT55820232018-06-25T06:06:27Z http://ndltd.ncl.edu.tw/handle/xsa2en A study of the project time/cost tradeoff problem optimization using Tabu search algorithm 以禁忌搜尋法應用於專案工期/成本權衡問題最佳化之研究 Chien-Chang Li 李建漳 碩士 朝陽科技大學 營建工程系碩士班 91 There are two objectives on the construction project resource scheduling: (1) to let all of the activities get their resources and then complete the works before the required finish date considering cost problem;(2) to make resource allocation and utilization efficiently to reduce the delay possibility of the works when the capacity; For achieving the objectives on construction project resource scheduling and cost minimization, this research offers a new model to solve the problems above. The traditional models still have many problems to solve this sort of problems.(i.e the speed of searching feasible solutions, etc,. ). Consequently, In this research we propose a model for solving project time/cost tradeoff problem under the constraint of limited resources using tabu search algorithm and makes some improvement on the disadvantages of traditional models in my study. Furthermore, this model will be more stable and efficient than the studies did before. The study implements the concept of Tabu Search algorithms(TS) to build a new model considering time/cost tradeoff problem. TS method achieves superior results compared to the other methods because it is based on introducing flexible memory structures in conjunction with strategic restrictions and aspiration rules as a means for exploiting search spaces. After the experimental test of the model the research propose, the result of the test compared the similar studies is good. Nai-Hsin Pan I-Tung Yang 潘 乃 欣 楊 亦 東 2003 學位論文 ; thesis 59 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 朝陽科技大學 === 營建工程系碩士班 === 91 === There are two objectives on the construction project resource scheduling: (1) to let all of the activities get their resources and then complete the works before the required finish date considering cost problem;(2) to make resource allocation and utilization efficiently to reduce the delay possibility of the works when the capacity; For achieving the objectives on construction project resource scheduling and cost minimization, this research offers a new model to solve the problems above. The traditional models still have many problems to solve this sort of problems.(i.e the speed of searching feasible solutions, etc,. ). Consequently, In this research we propose a model for solving project time/cost tradeoff problem under the constraint of limited resources using tabu search algorithm and makes some improvement on the disadvantages of traditional models in my study. Furthermore, this model will be more stable and efficient than the studies did before. The study implements the concept of Tabu Search algorithms(TS) to build a new model considering time/cost tradeoff problem.
TS method achieves superior results compared to the other methods because it is based on introducing flexible memory structures in conjunction with strategic restrictions and aspiration rules as a means for exploiting search spaces. After the experimental test of the model the research propose, the result of the test compared the similar studies is good.
|
author2 |
Nai-Hsin Pan |
author_facet |
Nai-Hsin Pan Chien-Chang Li 李建漳 |
author |
Chien-Chang Li 李建漳 |
spellingShingle |
Chien-Chang Li 李建漳 A study of the project time/cost tradeoff problem optimization using Tabu search algorithm |
author_sort |
Chien-Chang Li |
title |
A study of the project time/cost tradeoff problem optimization using Tabu search algorithm |
title_short |
A study of the project time/cost tradeoff problem optimization using Tabu search algorithm |
title_full |
A study of the project time/cost tradeoff problem optimization using Tabu search algorithm |
title_fullStr |
A study of the project time/cost tradeoff problem optimization using Tabu search algorithm |
title_full_unstemmed |
A study of the project time/cost tradeoff problem optimization using Tabu search algorithm |
title_sort |
study of the project time/cost tradeoff problem optimization using tabu search algorithm |
publishDate |
2003 |
url |
http://ndltd.ncl.edu.tw/handle/xsa2en |
work_keys_str_mv |
AT chienchangli astudyoftheprojecttimecosttradeoffproblemoptimizationusingtabusearchalgorithm AT lǐjiànzhāng astudyoftheprojecttimecosttradeoffproblemoptimizationusingtabusearchalgorithm AT chienchangli yǐjìnjìsōuxúnfǎyīngyòngyúzhuānàngōngqīchéngběnquánhéngwèntízuìjiāhuàzhīyánjiū AT lǐjiànzhāng yǐjìnjìsōuxúnfǎyīngyòngyúzhuānàngōngqīchéngběnquánhéngwèntízuìjiāhuàzhīyánjiū AT chienchangli studyoftheprojecttimecosttradeoffproblemoptimizationusingtabusearchalgorithm AT lǐjiànzhāng studyoftheprojecttimecosttradeoffproblemoptimizationusingtabusearchalgorithm |
_version_ |
1718706209107738624 |