Analysis of Construction Operation for All Casing Pile
碩士 === 朝陽科技大學 === 營建工程系碩士班 === 91 === ABSTRACT Many transportation construction projects are performed in Taiwan. Bridge structure is often used in those projects. The critical activity for construction a bridge is the foundation construction. In foundation construction, pile casing is usually the...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2003
|
Online Access: | http://ndltd.ncl.edu.tw/handle/2yub8x |
id |
ndltd-TW-091CYUT5582009 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-091CYUT55820092018-06-25T06:06:27Z http://ndltd.ncl.edu.tw/handle/2yub8x Analysis of Construction Operation for All Casing Pile 橋樑全套管基樁的施工資源組合分析 Kuang-Hui Chen 陳光輝 碩士 朝陽科技大學 營建工程系碩士班 91 ABSTRACT Many transportation construction projects are performed in Taiwan. Bridge structure is often used in those projects. The critical activity for construction a bridge is the foundation construction. In foundation construction, pile casing is usually the first activity to be performed. Among different type of pile casing, all-casing pile is quite common used. The operations of all-casing pile include position, driving piles, as well as concrete placing that form the cyclic operations. Discrete event simulation technique is suitable in the analysis of system performance for the cyclic operations. This research takes WH33 viaduct foundation construction project as example to analyze the production rate and unit cost for all-casing pile operations. The computer simulation software COST developed based on CYCLONE discrete simulation methodology is used for facilitating the analysis. Several resource combinations are examined for replacing the original resource allocation. Simulation analysis shows one type of resource allocation that can conduct a better system performance, i.e., lower unit cost and higher production rate. Tao-Ming Cheng 鄭道明 2003 學位論文 ; thesis 56 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 朝陽科技大學 === 營建工程系碩士班 === 91 === ABSTRACT
Many transportation construction projects are performed in Taiwan. Bridge structure is often used in those projects. The critical activity for construction a bridge is the foundation construction. In foundation construction, pile casing is usually the first activity to be performed. Among different type of pile casing, all-casing pile is quite common used. The operations of all-casing pile include position, driving piles, as well as concrete placing that form the cyclic operations. Discrete event simulation technique is suitable in the analysis of system performance for the cyclic operations. This research takes WH33 viaduct foundation construction project as example to analyze the production rate and unit cost for all-casing pile operations. The computer simulation software COST developed based on CYCLONE discrete simulation methodology is used for facilitating the analysis. Several resource combinations are examined for replacing the original resource allocation. Simulation analysis shows one type of resource allocation that can conduct a better system performance, i.e., lower unit cost and higher production rate.
|
author2 |
Tao-Ming Cheng |
author_facet |
Tao-Ming Cheng Kuang-Hui Chen 陳光輝 |
author |
Kuang-Hui Chen 陳光輝 |
spellingShingle |
Kuang-Hui Chen 陳光輝 Analysis of Construction Operation for All Casing Pile |
author_sort |
Kuang-Hui Chen |
title |
Analysis of Construction Operation for All Casing Pile |
title_short |
Analysis of Construction Operation for All Casing Pile |
title_full |
Analysis of Construction Operation for All Casing Pile |
title_fullStr |
Analysis of Construction Operation for All Casing Pile |
title_full_unstemmed |
Analysis of Construction Operation for All Casing Pile |
title_sort |
analysis of construction operation for all casing pile |
publishDate |
2003 |
url |
http://ndltd.ncl.edu.tw/handle/2yub8x |
work_keys_str_mv |
AT kuanghuichen analysisofconstructionoperationforallcasingpile AT chénguānghuī analysisofconstructionoperationforallcasingpile AT kuanghuichen qiáoliángquántàoguǎnjīzhuāngdeshīgōngzīyuánzǔhéfēnxī AT chénguānghuī qiáoliángquántàoguǎnjīzhuāngdeshīgōngzīyuánzǔhéfēnxī |
_version_ |
1718706200695013376 |