A Study of Long Term Demand Forecasting--Case Study of Taiwan Power Demand

碩士 === 淡江大學 === 管理科學學系 === 90 === The power demand forecast is very important in developing a power supply strategy and electric management. To plan a substation construction need lead time of about ten years, so the reliable demand forecasting is necessary for decision making. In this st...

Full description

Bibliographic Details
Main Authors: Hui-Ting Yang, 楊惠婷
Other Authors: Wei-Tzen Yang
Format: Others
Language:zh-TW
Published: 2002
Online Access:http://ndltd.ncl.edu.tw/handle/51476945502615775759