Shop Floor Scheduling Identical Parallel-Machine Production with Mold for Shoes Factory

碩士 === 東海大學 === 工業工程學系 === 90 === The production process of products is becoming more and more complex, and the life cycle time of products is getting short, it makes the factors that affect the scheduling problem to be more complicated. To simplify the complicated shop floor scheduling, in recently...

Full description

Bibliographic Details
Main Authors: Yung-Lung Chen, 陳永隆
Other Authors: Li-Chih Wang
Format: Others
Language:zh-TW
Published: 2002
Online Access:http://ndltd.ncl.edu.tw/handle/28846780288499976775
id ndltd-TW-090THU00030029
record_format oai_dc
spelling ndltd-TW-090THU000300292015-10-13T14:41:26Z http://ndltd.ncl.edu.tw/handle/28846780288499976775 Shop Floor Scheduling Identical Parallel-Machine Production with Mold for Shoes Factory 製鞋業相同平行機台搭配模具生產現場排程之研究 Yung-Lung Chen 陳永隆 碩士 東海大學 工業工程學系 90 The production process of products is becoming more and more complex, and the life cycle time of products is getting short, it makes the factors that affect the scheduling problem to be more complicated. To simplify the complicated shop floor scheduling, in recently researches, they applied the theory of constraint to develop new scheduling method — to plan and manage the bottleneck resource. There are two strategies to ship on time when the bottleneck is overloading, the first is outsourcing the process; the other is to increase the capacity for bottleneck. If there are over two machines to work with the same process, it is the parallel-machine scheduling problem. The parallel-machine scheduling problem is common in shoes factory, the most process use parallel machines or equipments to achieve the required capacity. The characteristic of shoes business is that every order contains size run, the different size use different mold for production. Every size in one order can be processed independently in any machine of some parallel machines. It is very complicated to schedule every order and every size in every parallel machine. It is hard to prioritize the orders and size. This research will provide a heuristic scheduling method — Size Critical Ratio - for solving the parallel-machine production problem in shoe factory. And dispatch the orders and jobs to every parallel machine. This research will develop a dispatching algorithm to minimize the total tardiness, and prioritize every job for production. According the algorithm, we will code a computer program to do the experiment. The experiment will give the result of scheduling for the algorithm. And the program will provide shop floor scheduling for every machine. In addition, we also use genetic algorithm (GA) to solve this problem, to compare these two different scheduling methods. Li-Chih Wang 王立志 2002 學位論文 ; thesis 0 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 東海大學 === 工業工程學系 === 90 === The production process of products is becoming more and more complex, and the life cycle time of products is getting short, it makes the factors that affect the scheduling problem to be more complicated. To simplify the complicated shop floor scheduling, in recently researches, they applied the theory of constraint to develop new scheduling method — to plan and manage the bottleneck resource. There are two strategies to ship on time when the bottleneck is overloading, the first is outsourcing the process; the other is to increase the capacity for bottleneck. If there are over two machines to work with the same process, it is the parallel-machine scheduling problem. The parallel-machine scheduling problem is common in shoes factory, the most process use parallel machines or equipments to achieve the required capacity. The characteristic of shoes business is that every order contains size run, the different size use different mold for production. Every size in one order can be processed independently in any machine of some parallel machines. It is very complicated to schedule every order and every size in every parallel machine. It is hard to prioritize the orders and size. This research will provide a heuristic scheduling method — Size Critical Ratio - for solving the parallel-machine production problem in shoe factory. And dispatch the orders and jobs to every parallel machine. This research will develop a dispatching algorithm to minimize the total tardiness, and prioritize every job for production. According the algorithm, we will code a computer program to do the experiment. The experiment will give the result of scheduling for the algorithm. And the program will provide shop floor scheduling for every machine. In addition, we also use genetic algorithm (GA) to solve this problem, to compare these two different scheduling methods.
author2 Li-Chih Wang
author_facet Li-Chih Wang
Yung-Lung Chen
陳永隆
author Yung-Lung Chen
陳永隆
spellingShingle Yung-Lung Chen
陳永隆
Shop Floor Scheduling Identical Parallel-Machine Production with Mold for Shoes Factory
author_sort Yung-Lung Chen
title Shop Floor Scheduling Identical Parallel-Machine Production with Mold for Shoes Factory
title_short Shop Floor Scheduling Identical Parallel-Machine Production with Mold for Shoes Factory
title_full Shop Floor Scheduling Identical Parallel-Machine Production with Mold for Shoes Factory
title_fullStr Shop Floor Scheduling Identical Parallel-Machine Production with Mold for Shoes Factory
title_full_unstemmed Shop Floor Scheduling Identical Parallel-Machine Production with Mold for Shoes Factory
title_sort shop floor scheduling identical parallel-machine production with mold for shoes factory
publishDate 2002
url http://ndltd.ncl.edu.tw/handle/28846780288499976775
work_keys_str_mv AT yunglungchen shopfloorschedulingidenticalparallelmachineproductionwithmoldforshoesfactory
AT chényǒnglóng shopfloorschedulingidenticalparallelmachineproductionwithmoldforshoesfactory
AT yunglungchen zhìxiéyèxiāngtóngpíngxíngjītáidāpèimójùshēngchǎnxiànchǎngpáichéngzhīyánjiū
AT chényǒnglóng zhìxiéyèxiāngtóngpíngxíngjītáidāpèimójùshēngchǎnxiànchǎngpáichéngzhīyánjiū
_version_ 1717757015091052544