Multi-level Proportional Lot Sizing and Scheduling Problem with PLC, Cash Flow and Market-Production Concerns

碩士 === 東海大學 === 工業工程學系 === 90 === Researches of the traditional lot sizing and scheduling problems often neglect the marketing effects and product strategy, and only look for production decision based on production limits such as capacity, lead time, and cost, etc. It is have lot sizing and scheduli...

Full description

Bibliographic Details
Main Authors: Chia-Tsung Chen, 陳家聰
Other Authors: Ping-Teng Chang
Format: Others
Language:zh-TW
Published: 2002
Online Access:http://ndltd.ncl.edu.tw/handle/30676618353825746370
id ndltd-TW-090THU00030004
record_format oai_dc
spelling ndltd-TW-090THU000300042015-10-13T14:41:25Z http://ndltd.ncl.edu.tw/handle/30676618353825746370 Multi-level Proportional Lot Sizing and Scheduling Problem with PLC, Cash Flow and Market-Production Concerns 多階比例式批量排程問題-具產品生命週期階段、現金流量與市場行銷生產要求之模式 Chia-Tsung Chen 陳家聰 碩士 東海大學 工業工程學系 90 Researches of the traditional lot sizing and scheduling problems often neglect the marketing effects and product strategy, and only look for production decision based on production limits such as capacity, lead time, and cost, etc. It is have lot sizing and scheduling models integrated marketing strategies, and not only focus on the optimization of production issues. This research integrated the traditional lot sizing and scheduling model and the concept of product life cycle (PLC) marketing strategy, cash flow, and learning curve, and used genetic algorithms (GAs) as the solution tool. Developing an multi-item, multi- level lot sizing and scheduling model incorporates the inventory models and actual market situation. This research, based upon the multi-level proportional lot sizing and scheduling problem with multiple machines (MM- PLSP), took into consideration stages of product life cycle, cash flow, and learning curve, and developed the three related modes: PLC based MM-PLSP (PLC-PLSP), cash flow-oriented MM-PLSP (CF-PLSP) and cash flow-oriented PLC-PLSP. By a numerical example, it was shown that considerations of the product life cycle factor improved the results of traditional lot sizing and scheduling model. Ping-Teng Chang 張炳騰 2002 學位論文 ; thesis 93 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 東海大學 === 工業工程學系 === 90 === Researches of the traditional lot sizing and scheduling problems often neglect the marketing effects and product strategy, and only look for production decision based on production limits such as capacity, lead time, and cost, etc. It is have lot sizing and scheduling models integrated marketing strategies, and not only focus on the optimization of production issues. This research integrated the traditional lot sizing and scheduling model and the concept of product life cycle (PLC) marketing strategy, cash flow, and learning curve, and used genetic algorithms (GAs) as the solution tool. Developing an multi-item, multi- level lot sizing and scheduling model incorporates the inventory models and actual market situation. This research, based upon the multi-level proportional lot sizing and scheduling problem with multiple machines (MM- PLSP), took into consideration stages of product life cycle, cash flow, and learning curve, and developed the three related modes: PLC based MM-PLSP (PLC-PLSP), cash flow-oriented MM-PLSP (CF-PLSP) and cash flow-oriented PLC-PLSP. By a numerical example, it was shown that considerations of the product life cycle factor improved the results of traditional lot sizing and scheduling model.
author2 Ping-Teng Chang
author_facet Ping-Teng Chang
Chia-Tsung Chen
陳家聰
author Chia-Tsung Chen
陳家聰
spellingShingle Chia-Tsung Chen
陳家聰
Multi-level Proportional Lot Sizing and Scheduling Problem with PLC, Cash Flow and Market-Production Concerns
author_sort Chia-Tsung Chen
title Multi-level Proportional Lot Sizing and Scheduling Problem with PLC, Cash Flow and Market-Production Concerns
title_short Multi-level Proportional Lot Sizing and Scheduling Problem with PLC, Cash Flow and Market-Production Concerns
title_full Multi-level Proportional Lot Sizing and Scheduling Problem with PLC, Cash Flow and Market-Production Concerns
title_fullStr Multi-level Proportional Lot Sizing and Scheduling Problem with PLC, Cash Flow and Market-Production Concerns
title_full_unstemmed Multi-level Proportional Lot Sizing and Scheduling Problem with PLC, Cash Flow and Market-Production Concerns
title_sort multi-level proportional lot sizing and scheduling problem with plc, cash flow and market-production concerns
publishDate 2002
url http://ndltd.ncl.edu.tw/handle/30676618353825746370
work_keys_str_mv AT chiatsungchen multilevelproportionallotsizingandschedulingproblemwithplccashflowandmarketproductionconcerns
AT chénjiācōng multilevelproportionallotsizingandschedulingproblemwithplccashflowandmarketproductionconcerns
AT chiatsungchen duōjiēbǐlìshìpīliàngpáichéngwèntíjùchǎnpǐnshēngmìngzhōuqījiēduànxiànjīnliúliàngyǔshìchǎngxíngxiāoshēngchǎnyàoqiúzhīmóshì
AT chénjiācōng duōjiēbǐlìshìpīliàngpáichéngwèntíjùchǎnpǐnshēngmìngzhōuqījiēduànxiànjīnliúliàngyǔshìchǎngxíngxiāoshēngchǎnyàoqiúzhīmóshì
_version_ 1717757003372167168