Submerged Panels against Scouring for Bridge Abutment Protection

碩士 === 國立成功大學 === 水利及海洋工程學系碩博士班 === 90 === ABSTRACT The objective of this study is to reduce scour depth of abutments for protecting the bridge. To reduce scour around bridge abutments. Direct methods are used in literature, dealing with abutments-scour problems, such as placed rocks, riprap or...

Full description

Bibliographic Details
Main Authors: An-Kang Liu, 劉安剛
Other Authors: Chin-Kun Huang
Format: Others
Language:zh-TW
Published: 2002
Online Access:http://ndltd.ncl.edu.tw/handle/ndx676
id ndltd-TW-090NCKU5083027
record_format oai_dc
spelling ndltd-TW-090NCKU50830272018-06-25T06:05:01Z http://ndltd.ncl.edu.tw/handle/ndx676 Submerged Panels against Scouring for Bridge Abutment Protection 底部導流隔板對橋台沖刷保護之研究 An-Kang Liu 劉安剛 碩士 國立成功大學 水利及海洋工程學系碩博士班 90 ABSTRACT The objective of this study is to reduce scour depth of abutments for protecting the bridge. To reduce scour around bridge abutments. Direct methods are used in literature, dealing with abutments-scour problems, such as placed rocks, riprap or flexible mattresses around the abutment foundation. This studies an indirect one that examines the effect of using submerged panels around the abutment. Experiments conducted in clear-water conditions. The angle of the panel is 135°, the width of the panel is 63 cm, the distance between panel and abutment equal to 0 cm, depth of panel with the submerged water is 1 cm. They can reduce scour depth as much as 99% in final equilibrium. Chin-Kun Huang 黃進坤 2002 學位論文 ; thesis 74 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立成功大學 === 水利及海洋工程學系碩博士班 === 90 === ABSTRACT The objective of this study is to reduce scour depth of abutments for protecting the bridge. To reduce scour around bridge abutments. Direct methods are used in literature, dealing with abutments-scour problems, such as placed rocks, riprap or flexible mattresses around the abutment foundation. This studies an indirect one that examines the effect of using submerged panels around the abutment. Experiments conducted in clear-water conditions. The angle of the panel is 135°, the width of the panel is 63 cm, the distance between panel and abutment equal to 0 cm, depth of panel with the submerged water is 1 cm. They can reduce scour depth as much as 99% in final equilibrium.
author2 Chin-Kun Huang
author_facet Chin-Kun Huang
An-Kang Liu
劉安剛
author An-Kang Liu
劉安剛
spellingShingle An-Kang Liu
劉安剛
Submerged Panels against Scouring for Bridge Abutment Protection
author_sort An-Kang Liu
title Submerged Panels against Scouring for Bridge Abutment Protection
title_short Submerged Panels against Scouring for Bridge Abutment Protection
title_full Submerged Panels against Scouring for Bridge Abutment Protection
title_fullStr Submerged Panels against Scouring for Bridge Abutment Protection
title_full_unstemmed Submerged Panels against Scouring for Bridge Abutment Protection
title_sort submerged panels against scouring for bridge abutment protection
publishDate 2002
url http://ndltd.ncl.edu.tw/handle/ndx676
work_keys_str_mv AT ankangliu submergedpanelsagainstscouringforbridgeabutmentprotection
AT liúāngāng submergedpanelsagainstscouringforbridgeabutmentprotection
AT ankangliu dǐbùdǎoliúgébǎnduìqiáotáichōngshuābǎohùzhīyánjiū
AT liúāngāng dǐbùdǎoliúgébǎnduìqiáotáichōngshuābǎohùzhīyánjiū
_version_ 1718703812709974016