Numerical Routing and Experimental Verification of Detention Pond for Different Rainfall Durations

碩士 === 國立中興大學 === 土木工程學系 === 90 === Abstract Land development is known to cause a large coefficient of surface runoff. When rainfall happens, more floods occur downstream than upstream. A detention pond must be constructed to reduce the peak time and peak discharge by making use of stora...

Full description

Bibliographic Details
Main Authors: Chuan-Wei Wu, 吳傳偉
Other Authors: Jen-Yan Chen
Format: Others
Language:zh-TW
Published: 2002
Online Access:http://ndltd.ncl.edu.tw/handle/57889984810673837742

Similar Items