The Knowledge Management System of Task Dispatching for PCB Dual In-Line Package

碩士 === 華梵大學 === 工業管理學系碩士班 === 90 === The market demand has driven the production environment toward customers oriented. This results in the production in the direction of reduced quantity and increased product variation. The balance issues among workstations in the process planning become a major...

Full description

Bibliographic Details
Main Authors: Lan-Yi Lee, 李藍怡
Other Authors: Chien-Yi Huang
Format: Others
Language:zh-TW
Published: 2002
Online Access:http://ndltd.ncl.edu.tw/handle/66723514030044617969
id ndltd-TW-090HCHT0041005
record_format oai_dc
spelling ndltd-TW-090HCHT00410052015-10-13T17:39:44Z http://ndltd.ncl.edu.tw/handle/66723514030044617969 The Knowledge Management System of Task Dispatching for PCB Dual In-Line Package PCB手插件工作指派之知識管理系統 Lan-Yi Lee 李藍怡 碩士 華梵大學 工業管理學系碩士班 90 The market demand has driven the production environment toward customers oriented. This results in the production in the direction of reduced quantity and increased product variation. The balance issues among workstations in the process planning become a major focus to ensure the company’s market competition. Significant variation of DIP devices was observed during the manual insertion in the PCB assembly process. This phenomenon causes the manual dispatching of components to workstations problematic. The production schedule could be delayed for new products and/or existing productions when an engineering change is required. Besides, the consistency of dispatching results are not well controlled between different engineers especially as the primary personnel resigned. This research is a joint effort between academics and industry in the electronic packaging/assembly domain. A knowledge management system constructed with Visual Basic software is developed to suggest a desire tasks dispatching scenario. This system requires input files such as bill of materials, component layout files, placement orientation, operators’ familiarity, PCB travel direction, etc. Constraint rules were established through the collection of knowledge from engineers and experience from operators. Factors considered for precedence rules are habitual and motion study related. The specific constraints under study included components groups, component height classes, coordinates, etc. The corresponding process cycle time, line efficiency, throughputs are provided. This system also generates a graph based standard operation procedure and has been implemented in practical production environment. Chien-Yi Huang 黃乾怡 2002 學位論文 ; thesis 130 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 華梵大學 === 工業管理學系碩士班 === 90 === The market demand has driven the production environment toward customers oriented. This results in the production in the direction of reduced quantity and increased product variation. The balance issues among workstations in the process planning become a major focus to ensure the company’s market competition. Significant variation of DIP devices was observed during the manual insertion in the PCB assembly process. This phenomenon causes the manual dispatching of components to workstations problematic. The production schedule could be delayed for new products and/or existing productions when an engineering change is required. Besides, the consistency of dispatching results are not well controlled between different engineers especially as the primary personnel resigned. This research is a joint effort between academics and industry in the electronic packaging/assembly domain. A knowledge management system constructed with Visual Basic software is developed to suggest a desire tasks dispatching scenario. This system requires input files such as bill of materials, component layout files, placement orientation, operators’ familiarity, PCB travel direction, etc. Constraint rules were established through the collection of knowledge from engineers and experience from operators. Factors considered for precedence rules are habitual and motion study related. The specific constraints under study included components groups, component height classes, coordinates, etc. The corresponding process cycle time, line efficiency, throughputs are provided. This system also generates a graph based standard operation procedure and has been implemented in practical production environment.
author2 Chien-Yi Huang
author_facet Chien-Yi Huang
Lan-Yi Lee
李藍怡
author Lan-Yi Lee
李藍怡
spellingShingle Lan-Yi Lee
李藍怡
The Knowledge Management System of Task Dispatching for PCB Dual In-Line Package
author_sort Lan-Yi Lee
title The Knowledge Management System of Task Dispatching for PCB Dual In-Line Package
title_short The Knowledge Management System of Task Dispatching for PCB Dual In-Line Package
title_full The Knowledge Management System of Task Dispatching for PCB Dual In-Line Package
title_fullStr The Knowledge Management System of Task Dispatching for PCB Dual In-Line Package
title_full_unstemmed The Knowledge Management System of Task Dispatching for PCB Dual In-Line Package
title_sort knowledge management system of task dispatching for pcb dual in-line package
publishDate 2002
url http://ndltd.ncl.edu.tw/handle/66723514030044617969
work_keys_str_mv AT lanyilee theknowledgemanagementsystemoftaskdispatchingforpcbdualinlinepackage
AT lǐlányí theknowledgemanagementsystemoftaskdispatchingforpcbdualinlinepackage
AT lanyilee pcbshǒuchājiàngōngzuòzhǐpàizhīzhīshíguǎnlǐxìtǒng
AT lǐlányí pcbshǒuchājiàngōngzuòzhǐpàizhīzhīshíguǎnlǐxìtǒng
AT lanyilee knowledgemanagementsystemoftaskdispatchingforpcbdualinlinepackage
AT lǐlányí knowledgemanagementsystemoftaskdispatchingforpcbdualinlinepackage
_version_ 1717783504451796992