The Knowledge Management System of Task Dispatching for PCB Dual In-Line Package
碩士 === 華梵大學 === 工業管理學系碩士班 === 90 === The market demand has driven the production environment toward customers oriented. This results in the production in the direction of reduced quantity and increased product variation. The balance issues among workstations in the process planning become a major...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2002
|
Online Access: | http://ndltd.ncl.edu.tw/handle/66723514030044617969 |
id |
ndltd-TW-090HCHT0041005 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-090HCHT00410052015-10-13T17:39:44Z http://ndltd.ncl.edu.tw/handle/66723514030044617969 The Knowledge Management System of Task Dispatching for PCB Dual In-Line Package PCB手插件工作指派之知識管理系統 Lan-Yi Lee 李藍怡 碩士 華梵大學 工業管理學系碩士班 90 The market demand has driven the production environment toward customers oriented. This results in the production in the direction of reduced quantity and increased product variation. The balance issues among workstations in the process planning become a major focus to ensure the company’s market competition. Significant variation of DIP devices was observed during the manual insertion in the PCB assembly process. This phenomenon causes the manual dispatching of components to workstations problematic. The production schedule could be delayed for new products and/or existing productions when an engineering change is required. Besides, the consistency of dispatching results are not well controlled between different engineers especially as the primary personnel resigned. This research is a joint effort between academics and industry in the electronic packaging/assembly domain. A knowledge management system constructed with Visual Basic software is developed to suggest a desire tasks dispatching scenario. This system requires input files such as bill of materials, component layout files, placement orientation, operators’ familiarity, PCB travel direction, etc. Constraint rules were established through the collection of knowledge from engineers and experience from operators. Factors considered for precedence rules are habitual and motion study related. The specific constraints under study included components groups, component height classes, coordinates, etc. The corresponding process cycle time, line efficiency, throughputs are provided. This system also generates a graph based standard operation procedure and has been implemented in practical production environment. Chien-Yi Huang 黃乾怡 2002 學位論文 ; thesis 130 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 華梵大學 === 工業管理學系碩士班 === 90 === The market demand has driven the production environment toward customers oriented. This results in the production in the direction of reduced quantity and increased product variation. The balance issues among workstations in the process planning become a major focus to ensure the company’s market competition. Significant variation of DIP devices was observed during the manual insertion in the PCB assembly process. This phenomenon causes the manual dispatching of components to workstations problematic. The production schedule could be delayed for new products and/or existing productions when an engineering change is required. Besides, the consistency of dispatching results are not well controlled between different engineers especially as the primary personnel resigned.
This research is a joint effort between academics and industry in the electronic packaging/assembly domain. A knowledge management system constructed with Visual Basic software is developed to suggest a desire tasks dispatching scenario. This system requires input files such as bill of materials, component layout files, placement orientation, operators’ familiarity, PCB travel direction, etc. Constraint rules were established through the collection of knowledge from engineers and experience from operators. Factors considered for precedence rules are habitual and motion study related. The specific constraints under study included components groups, component height classes, coordinates, etc. The corresponding process cycle time, line efficiency, throughputs are provided. This system also generates a graph based standard operation procedure and has been implemented in practical production environment.
|
author2 |
Chien-Yi Huang |
author_facet |
Chien-Yi Huang Lan-Yi Lee 李藍怡 |
author |
Lan-Yi Lee 李藍怡 |
spellingShingle |
Lan-Yi Lee 李藍怡 The Knowledge Management System of Task Dispatching for PCB Dual In-Line Package |
author_sort |
Lan-Yi Lee |
title |
The Knowledge Management System of Task Dispatching for PCB Dual In-Line Package |
title_short |
The Knowledge Management System of Task Dispatching for PCB Dual In-Line Package |
title_full |
The Knowledge Management System of Task Dispatching for PCB Dual In-Line Package |
title_fullStr |
The Knowledge Management System of Task Dispatching for PCB Dual In-Line Package |
title_full_unstemmed |
The Knowledge Management System of Task Dispatching for PCB Dual In-Line Package |
title_sort |
knowledge management system of task dispatching for pcb dual in-line package |
publishDate |
2002 |
url |
http://ndltd.ncl.edu.tw/handle/66723514030044617969 |
work_keys_str_mv |
AT lanyilee theknowledgemanagementsystemoftaskdispatchingforpcbdualinlinepackage AT lǐlányí theknowledgemanagementsystemoftaskdispatchingforpcbdualinlinepackage AT lanyilee pcbshǒuchājiàngōngzuòzhǐpàizhīzhīshíguǎnlǐxìtǒng AT lǐlányí pcbshǒuchājiàngōngzuòzhǐpàizhīzhīshíguǎnlǐxìtǒng AT lanyilee knowledgemanagementsystemoftaskdispatchingforpcbdualinlinepackage AT lǐlányí knowledgemanagementsystemoftaskdispatchingforpcbdualinlinepackage |
_version_ |
1717783504451796992 |