A Capacity Backup Determination Model for Wafer Foundry

碩士 === 中華大學 === 科技管理研究所 === 90 === In the wafer foundry industry, due to high investment cost and fast depreciation in equipment, the fully use of equipment utilization and increasing the productivity are the major objectives of all foundries. As we know, the output of fab is limited by the bottlene...

Full description

Bibliographic Details
Main Authors: Yu-Hsiu Chao, 趙裕修
Other Authors: Ying-Mei Tu
Format: Others
Language:zh-TW
Published: 2002
Online Access:http://ndltd.ncl.edu.tw/handle/17576619761374115291
id ndltd-TW-090CHPI0230063
record_format oai_dc
spelling ndltd-TW-090CHPI02300632015-10-13T17:34:59Z http://ndltd.ncl.edu.tw/handle/17576619761374115291 A Capacity Backup Determination Model for Wafer Foundry 晶圓代工廠產能支援決策模式 Yu-Hsiu Chao 趙裕修 碩士 中華大學 科技管理研究所 90 In the wafer foundry industry, due to high investment cost and fast depreciation in equipment, the fully use of equipment utilization and increasing the productivity are the major objectives of all foundries. As we know, the output of fab is limited by the bottleneck machine. If there is a discrepancy between planned and actual products mix, the new bottleneck machine will occur and the capacity will be short. In general, all famous foundries, such as TSMC, UMC,…etc., are taken the backup solution for this kind of problem. Unfortunately, the side effects will occur if the backup quantity can’t be well controlled. Based on the above situation, a capacity backup determination model will be proposed. There are two parts in this model , one is Excess Capacity Determination Model (ECDM) ; the other is Performance Evaluation Model (PEM). The concept of protective capacity is applied to determine the excess capacity in ECDM. The determination of protective capacity is based on statistical fluctuation of factory which includes the machine downtime and unreasonable waiting time of WIP before machines. The queuing theory and Little’s Law are applied in PEM to evaluate the influences upon throughput、WIP and cycle time of backup fab when the requested backup capacity is over excess capacity which backup fab can support. Based on the information provided by the capacity backup determination model, the decisions of capacity backup can be made accordingly. Ying-Mei Tu 杜瑩美 2002 學位論文 ; thesis 89 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 中華大學 === 科技管理研究所 === 90 === In the wafer foundry industry, due to high investment cost and fast depreciation in equipment, the fully use of equipment utilization and increasing the productivity are the major objectives of all foundries. As we know, the output of fab is limited by the bottleneck machine. If there is a discrepancy between planned and actual products mix, the new bottleneck machine will occur and the capacity will be short. In general, all famous foundries, such as TSMC, UMC,…etc., are taken the backup solution for this kind of problem. Unfortunately, the side effects will occur if the backup quantity can’t be well controlled. Based on the above situation, a capacity backup determination model will be proposed. There are two parts in this model , one is Excess Capacity Determination Model (ECDM) ; the other is Performance Evaluation Model (PEM). The concept of protective capacity is applied to determine the excess capacity in ECDM. The determination of protective capacity is based on statistical fluctuation of factory which includes the machine downtime and unreasonable waiting time of WIP before machines. The queuing theory and Little’s Law are applied in PEM to evaluate the influences upon throughput、WIP and cycle time of backup fab when the requested backup capacity is over excess capacity which backup fab can support. Based on the information provided by the capacity backup determination model, the decisions of capacity backup can be made accordingly.
author2 Ying-Mei Tu
author_facet Ying-Mei Tu
Yu-Hsiu Chao
趙裕修
author Yu-Hsiu Chao
趙裕修
spellingShingle Yu-Hsiu Chao
趙裕修
A Capacity Backup Determination Model for Wafer Foundry
author_sort Yu-Hsiu Chao
title A Capacity Backup Determination Model for Wafer Foundry
title_short A Capacity Backup Determination Model for Wafer Foundry
title_full A Capacity Backup Determination Model for Wafer Foundry
title_fullStr A Capacity Backup Determination Model for Wafer Foundry
title_full_unstemmed A Capacity Backup Determination Model for Wafer Foundry
title_sort capacity backup determination model for wafer foundry
publishDate 2002
url http://ndltd.ncl.edu.tw/handle/17576619761374115291
work_keys_str_mv AT yuhsiuchao acapacitybackupdeterminationmodelforwaferfoundry
AT zhàoyùxiū acapacitybackupdeterminationmodelforwaferfoundry
AT yuhsiuchao jīngyuándàigōngchǎngchǎnnéngzhīyuánjuécèmóshì
AT zhàoyùxiū jīngyuándàigōngchǎngchǎnnéngzhīyuánjuécèmóshì
AT yuhsiuchao capacitybackupdeterminationmodelforwaferfoundry
AT zhàoyùxiū capacitybackupdeterminationmodelforwaferfoundry
_version_ 1717782429389815808