A Method for Determination of the Warring Stage Along River Bank

碩士 === 淡江大學 === 水資源及環境工程學系 === 89 === The basin of Taiwan was over development. This will be increase the flood danger of city in the downstream of river. Therefore, it will be to set up the flood control structure. Because of think of economical and protect the prop...

Full description

Bibliographic Details
Main Authors: Su-Pai Kao, 高蘇白
Other Authors: Chung C. Hsu
Format: Others
Language:zh-TW
Published: 2001
Online Access:http://ndltd.ncl.edu.tw/handle/30160682839809065840
id ndltd-TW-089TKU00089039
record_format oai_dc
spelling ndltd-TW-089TKU000890392015-10-13T12:10:01Z http://ndltd.ncl.edu.tw/handle/30160682839809065840 A Method for Determination of the Warring Stage Along River Bank 河川警示水位擬定之研究 Su-Pai Kao 高蘇白 碩士 淡江大學 水資源及環境工程學系 89 The basin of Taiwan was over development. This will be increase the flood danger of city in the downstream of river. Therefore, it will be to set up the flood control structure. Because of think of economical and protect the property of people .We will formulating a warring stage along river bank . But , how we make sure the stage will be increase to warring stage , or how many time stage will be warring stage.We can use statistics theo- -rem and unsteady flow model to determination a warring stage. Finally , We consider two different situation. They are same cumulative distribu- -tion function with warring time of different stage err (e.g.P=cons.(%),Tr=x` (hrs) , dy=y` (m))and same time err with different cumulative distribution function of different stage err. (e.g.P=x`(%),Tr=cons. (hrs),dy=y`(m)) From the model , the warring time is inverse proportion of rainfall duration and proba- -bility of overflow is direct proportion of rainfall duration. Chung C. Hsu 許中杰 2001 學位論文 ; thesis 58 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 淡江大學 === 水資源及環境工程學系 === 89 === The basin of Taiwan was over development. This will be increase the flood danger of city in the downstream of river. Therefore, it will be to set up the flood control structure. Because of think of economical and protect the property of people .We will formulating a warring stage along river bank . But , how we make sure the stage will be increase to warring stage , or how many time stage will be warring stage.We can use statistics theo- -rem and unsteady flow model to determination a warring stage. Finally , We consider two different situation. They are same cumulative distribu- -tion function with warring time of different stage err (e.g.P=cons.(%),Tr=x` (hrs) , dy=y` (m))and same time err with different cumulative distribution function of different stage err. (e.g.P=x`(%),Tr=cons. (hrs),dy=y`(m)) From the model , the warring time is inverse proportion of rainfall duration and proba- -bility of overflow is direct proportion of rainfall duration.
author2 Chung C. Hsu
author_facet Chung C. Hsu
Su-Pai Kao
高蘇白
author Su-Pai Kao
高蘇白
spellingShingle Su-Pai Kao
高蘇白
A Method for Determination of the Warring Stage Along River Bank
author_sort Su-Pai Kao
title A Method for Determination of the Warring Stage Along River Bank
title_short A Method for Determination of the Warring Stage Along River Bank
title_full A Method for Determination of the Warring Stage Along River Bank
title_fullStr A Method for Determination of the Warring Stage Along River Bank
title_full_unstemmed A Method for Determination of the Warring Stage Along River Bank
title_sort method for determination of the warring stage along river bank
publishDate 2001
url http://ndltd.ncl.edu.tw/handle/30160682839809065840
work_keys_str_mv AT supaikao amethodfordeterminationofthewarringstagealongriverbank
AT gāosūbái amethodfordeterminationofthewarringstagealongriverbank
AT supaikao héchuānjǐngshìshuǐwèinǐdìngzhīyánjiū
AT gāosūbái héchuānjǐngshìshuǐwèinǐdìngzhīyánjiū
AT supaikao methodfordeterminationofthewarringstagealongriverbank
AT gāosūbái methodfordeterminationofthewarringstagealongriverbank
_version_ 1716854697193635840