A Study on Hazard Prevention For CUT-AND-COVER Construction In Taipei Mass Transit System Project
碩士 === 國立臺北科技大學 === 土木與防災技術研究所 === 89 === The work site of deep excavation during the construction of Taipei Mass Transit System Project is highly dangerous. Also highly dangerous construction items and hazardous characteristics are accompanied with such work. The current Labor Safety and Hygiene La...
Main Authors: | Fang pao chuan, 方保全 |
---|---|
Other Authors: | 張寬勇 |
Format: | Others |
Language: | zh-TW |
Published: |
2001
|
Online Access: | http://ndltd.ncl.edu.tw/handle/03058695121330546531 |
Similar Items
-
The research of establishing public construction disaster prevention system:the case of cut-and-cover in MRTS construction
by: 游澄發
Published: (2004) -
Study on the Flood Prevention of construction of Taipei rapid transit system
by: Shen Shu Chi, et al.
Published: (2013) -
A study on integration of transportation system to cooperate the Taipei-Tamshui mass rapid transit line
by: FANG, ZHI-WEN, et al.
Published: (1988) -
Preventive Interface Management for Complex Capital Projects A Case Study of Mass Rapid Transit Project Construction
by: Huei-Huang Yeh, et al.
Published: (2019) -
STUDY THE MANAGED PROCEDURES OF DESIGN AND CONSTRUCTION FOR ESCALATOR PROJECTS IN TAIPEI RAPID TRANSIT SYSTEM
by: Ruey-Chin Chen, et al.
Published: (2006)