Study on the Contingency Load Transfer of Taipower’s Preliminary Closed Rings
碩士 === 國立臺灣科技大學 === 電機工程系 === 89 === Abstract The intention of this thesis is to investigate the contingency load transfer problem of Taipower’s preliminary closed rings, to realize the capability of load transfer between this pilot system and adjoining systems, and then to insure the ope...
Main Authors: | Po-Huang Yu, 游伯煌 |
---|---|
Other Authors: | Tsai-Hsiang Chen |
Format: | Others |
Language: | zh-TW |
Published: |
2001
|
Online Access: | http://ndltd.ncl.edu.tw/handle/43428496749585311898 |
Similar Items
-
Planning Scheme on the Load Transfer ofTaipower’s Closed Network Systems
by: 詹萬戶
Published: (2007) -
Underfrequency Load Shedding Strategy Researching on Taipower System
by: Ling- Hsiao Li, et al.
Published: (2008) -
The Effect of Load Models on the Taipower System Frequency Declines
by: Wei-Chin Chang, et al.
Published: (2000) -
The Analysis of Temperature Sensitivity and Load Characteristics of Taipower System
by: Wen-Pin Chen, et al.
Published: (2000) -
The Study of Load Characteristics in Taipower and Its Effect on Power System Operation
by: Meei-Song Kang, et al.
Published: (2001)