Critical Solutions to EMS NPI -- Case Study

碩士 === 國立交通大學 === 高階主管管理學程碩士班 === 89 === Electronics Manufacturing Service is one of the most important business models both in Taiwan and China. The effectiveness of New Product Introduction is the critical core competing factor of EMS industry. This thesis is trying to discover EMS NPI key success...

Full description

Bibliographic Details
Main Authors: Jui-Lung Yu, 游瑞龍
Other Authors: Rong Kwei Li
Format: Others
Language:en_US
Published: 2001
Online Access:http://ndltd.ncl.edu.tw/handle/27579050930377965572
id ndltd-TW-089NCTU0627028
record_format oai_dc
spelling ndltd-TW-089NCTU06270282016-01-29T04:28:16Z http://ndltd.ncl.edu.tw/handle/27579050930377965572 Critical Solutions to EMS NPI -- Case Study 電子製造代工業新產品導入關鍵性對策--個案研究 Jui-Lung Yu 游瑞龍 碩士 國立交通大學 高階主管管理學程碩士班 89 Electronics Manufacturing Service is one of the most important business models both in Taiwan and China. The effectiveness of New Product Introduction is the critical core competing factor of EMS industry. This thesis is trying to discover EMS NPI key success factors. Also, "Critical Solutions to EMS NPI -- Case Study" is based on the experiences and stories happened in 1999 and 2000, when I worked for C Company, and gained the great opportunities to get involved in those projects. Since EMS is facing challenges of short time-to-market, low cost competition, ever-growing global market demand than local market competition and worldwide logistics instead of domestic supply. Successfully develop and implement an unique NPI process will provide a competitive edge. There are five fundamental characteristics of the competitive NPI process. Three of them are unique characteristics to EMS NPI, which are (1) multiple projects with multiple locations, (2) engineering, material and data transfer concurrently and (3) global strategy and local execution effectiveness. The other two are also important to EMS NPI but common to any other industrial competition, which are speed and cost effectiveness. NPI process is a linkage between OEM, the brand owner; EMS, the manufacturing service provider and the market. Both OEM and EMS should be matured in the new product introduction process to ensure the market been fulfilled effectively with high speed and low cost. There were three selected cases, the first one is OEM, the second is a product designer, and the third is a typical EMS. The purpose is trying to express the NPI issues from different angles. The first one is an OEM, B Company story that tells about the difficulties of its NPI program start-up, especially the weaknesses on material management and engineering design of NPI system. Their impacts are reflected on designing for material availability, management maturity on material, too much customized parts and too many local small supplier without global support, internal part numbering system are very difficult to link with common parts market which constrained material availability and project ramp up. A Company is selected as a product designer for the OEM. It''s a story about the NPI issues on outsourcing a D Company notebook personal computer to Malaysia. Also, it''s selected with the purpose to check a typical Taiwanese player''s NPI issues. Very significant, the issues occurred on material management and the design infrastructure created an impact on its material supply base during the product start-up stage. C Company is selected as example of typical EMS, with its strengths on material, marketing, common process and production integration in its NPI system. Rong Kwei Li 李榮貴 2001 學位論文 ; thesis 30 en_US
collection NDLTD
language en_US
format Others
sources NDLTD
description 碩士 === 國立交通大學 === 高階主管管理學程碩士班 === 89 === Electronics Manufacturing Service is one of the most important business models both in Taiwan and China. The effectiveness of New Product Introduction is the critical core competing factor of EMS industry. This thesis is trying to discover EMS NPI key success factors. Also, "Critical Solutions to EMS NPI -- Case Study" is based on the experiences and stories happened in 1999 and 2000, when I worked for C Company, and gained the great opportunities to get involved in those projects. Since EMS is facing challenges of short time-to-market, low cost competition, ever-growing global market demand than local market competition and worldwide logistics instead of domestic supply. Successfully develop and implement an unique NPI process will provide a competitive edge. There are five fundamental characteristics of the competitive NPI process. Three of them are unique characteristics to EMS NPI, which are (1) multiple projects with multiple locations, (2) engineering, material and data transfer concurrently and (3) global strategy and local execution effectiveness. The other two are also important to EMS NPI but common to any other industrial competition, which are speed and cost effectiveness. NPI process is a linkage between OEM, the brand owner; EMS, the manufacturing service provider and the market. Both OEM and EMS should be matured in the new product introduction process to ensure the market been fulfilled effectively with high speed and low cost. There were three selected cases, the first one is OEM, the second is a product designer, and the third is a typical EMS. The purpose is trying to express the NPI issues from different angles. The first one is an OEM, B Company story that tells about the difficulties of its NPI program start-up, especially the weaknesses on material management and engineering design of NPI system. Their impacts are reflected on designing for material availability, management maturity on material, too much customized parts and too many local small supplier without global support, internal part numbering system are very difficult to link with common parts market which constrained material availability and project ramp up. A Company is selected as a product designer for the OEM. It''s a story about the NPI issues on outsourcing a D Company notebook personal computer to Malaysia. Also, it''s selected with the purpose to check a typical Taiwanese player''s NPI issues. Very significant, the issues occurred on material management and the design infrastructure created an impact on its material supply base during the product start-up stage. C Company is selected as example of typical EMS, with its strengths on material, marketing, common process and production integration in its NPI system.
author2 Rong Kwei Li
author_facet Rong Kwei Li
Jui-Lung Yu
游瑞龍
author Jui-Lung Yu
游瑞龍
spellingShingle Jui-Lung Yu
游瑞龍
Critical Solutions to EMS NPI -- Case Study
author_sort Jui-Lung Yu
title Critical Solutions to EMS NPI -- Case Study
title_short Critical Solutions to EMS NPI -- Case Study
title_full Critical Solutions to EMS NPI -- Case Study
title_fullStr Critical Solutions to EMS NPI -- Case Study
title_full_unstemmed Critical Solutions to EMS NPI -- Case Study
title_sort critical solutions to ems npi -- case study
publishDate 2001
url http://ndltd.ncl.edu.tw/handle/27579050930377965572
work_keys_str_mv AT juilungyu criticalsolutionstoemsnpicasestudy
AT yóuruìlóng criticalsolutionstoemsnpicasestudy
AT juilungyu diànzizhìzàodàigōngyèxīnchǎnpǐndǎorùguānjiànxìngduìcègèànyánjiū
AT yóuruìlóng diànzizhìzàodàigōngyèxīnchǎnpǐndǎorùguānjiànxìngduìcègèànyánjiū
_version_ 1718171298010497024