Applying TOC in Project Risk Analysis and Management -- An Example of The International Aerospace Cooperative Project

碩士 === 逢甲大學 === 工業工程學系 === 89 === The subjectivity and objectivity of the resources limitations cause project’s risks. Enterprise resources limitations are dynamic and unavoidable, thus projecting significant uncertainty and risk on various projects and programs. The duration of projects...

Full description

Bibliographic Details
Main Author: 何寶民
Other Authors: 蕭堯仁
Format: Others
Language:zh-TW
Published: 2001
Online Access:http://ndltd.ncl.edu.tw/handle/68179971395469383979
id ndltd-TW-089FCU00030034
record_format oai_dc
spelling ndltd-TW-089FCU000300342016-07-06T04:10:20Z http://ndltd.ncl.edu.tw/handle/68179971395469383979 Applying TOC in Project Risk Analysis and Management -- An Example of The International Aerospace Cooperative Project 以限制理論分析專案之風險與管理---以某公司國際航太合作專案為例 何寶民 碩士 逢甲大學 工業工程學系 89 The subjectivity and objectivity of the resources limitations cause project’s risks. Enterprise resources limitations are dynamic and unavoidable, thus projecting significant uncertainty and risk on various projects and programs. The duration of projects can range from just a few months to a few years. Project risks are entwined relationship among design, manufacturing, schedules, quality, etc. If project management does not take into consideration of the various factors during early analysis and planning phase, not only increased risk on the subject projects, engineering and cost efficiency are also greatly sacrificed.This research is focus on the project’s risks caused by the subjectivity of the resources constraints (project management, technique, quality, schedule, cost…etc.). Applying the Theory Of Constraints (T.O.C.) to the project management in order to increase the project successfully. Aerospace industries project risks are varied by the different stages of the project life cycle because of the changed resources limitations. Thus introducing theory of constraint techniques to reduce time to product delivery has become very attractive. This research is applying the TOC thinking process’s three major issues and five steps of the focusing process to analyze effects that occur in the project environment so that core causes can be discovered and simple solutions developed. The religious use of currently reality trees, evaporating clouds, future reality trees, prerequisite trees and transition trees in problem resolution at all levels to enhance project/program success rate and reduce project schedules. Finally, as an example of international aerospace cooperative project of H company, by using the TOC to meet the performance requirement and on time delivered the first shipset. 蕭堯仁 2001 學位論文 ; thesis 68 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 逢甲大學 === 工業工程學系 === 89 === The subjectivity and objectivity of the resources limitations cause project’s risks. Enterprise resources limitations are dynamic and unavoidable, thus projecting significant uncertainty and risk on various projects and programs. The duration of projects can range from just a few months to a few years. Project risks are entwined relationship among design, manufacturing, schedules, quality, etc. If project management does not take into consideration of the various factors during early analysis and planning phase, not only increased risk on the subject projects, engineering and cost efficiency are also greatly sacrificed.This research is focus on the project’s risks caused by the subjectivity of the resources constraints (project management, technique, quality, schedule, cost…etc.). Applying the Theory Of Constraints (T.O.C.) to the project management in order to increase the project successfully. Aerospace industries project risks are varied by the different stages of the project life cycle because of the changed resources limitations. Thus introducing theory of constraint techniques to reduce time to product delivery has become very attractive. This research is applying the TOC thinking process’s three major issues and five steps of the focusing process to analyze effects that occur in the project environment so that core causes can be discovered and simple solutions developed. The religious use of currently reality trees, evaporating clouds, future reality trees, prerequisite trees and transition trees in problem resolution at all levels to enhance project/program success rate and reduce project schedules. Finally, as an example of international aerospace cooperative project of H company, by using the TOC to meet the performance requirement and on time delivered the first shipset.
author2 蕭堯仁
author_facet 蕭堯仁
何寶民
author 何寶民
spellingShingle 何寶民
Applying TOC in Project Risk Analysis and Management -- An Example of The International Aerospace Cooperative Project
author_sort 何寶民
title Applying TOC in Project Risk Analysis and Management -- An Example of The International Aerospace Cooperative Project
title_short Applying TOC in Project Risk Analysis and Management -- An Example of The International Aerospace Cooperative Project
title_full Applying TOC in Project Risk Analysis and Management -- An Example of The International Aerospace Cooperative Project
title_fullStr Applying TOC in Project Risk Analysis and Management -- An Example of The International Aerospace Cooperative Project
title_full_unstemmed Applying TOC in Project Risk Analysis and Management -- An Example of The International Aerospace Cooperative Project
title_sort applying toc in project risk analysis and management -- an example of the international aerospace cooperative project
publishDate 2001
url http://ndltd.ncl.edu.tw/handle/68179971395469383979
work_keys_str_mv AT hébǎomín applyingtocinprojectriskanalysisandmanagementanexampleoftheinternationalaerospacecooperativeproject
AT hébǎomín yǐxiànzhìlǐlùnfēnxīzhuānànzhīfēngxiǎnyǔguǎnlǐyǐmǒugōngsīguójìhángtàihézuòzhuānànwèilì
_version_ 1718337768993587200