Preliminary study for the Exact Opening time of Overlay Pavement to Traffic

碩士 === 中原大學 === 土木工程研究所 === 89 === In the past few years, the quality control of highway pavement maintenance becomes more difficult with increasing traffic and vehicle loading. Usually, the overlay works of pavement maintenance were pressed to perform through midnight to next morning, and often rel...

Full description

Bibliographic Details
Main Authors: Hau-Sheng Shiu, 許皓昇
Other Authors: Dave Ta-Teh Chang
Format: Others
Language:zh-TW
Published: 2001
Online Access:http://ndltd.ncl.edu.tw/handle/73125438590710568910