Preliminary study for the Exact Opening time of Overlay Pavement to Traffic
碩士 === 中原大學 === 土木工程研究所 === 89 === In the past few years, the quality control of highway pavement maintenance becomes more difficult with increasing traffic and vehicle loading. Usually, the overlay works of pavement maintenance were pressed to perform through midnight to next morning, and often rel...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2001
|
Online Access: | http://ndltd.ncl.edu.tw/handle/73125438590710568910 |