Studies on Optimal Construction Scheduling Models under Uncertainty
碩士 === 國立臺灣科技大學 === 營建工程系 === 88 === Most current uncertain construction scheduling models do not consider the constraint of resources, and the optimization mechanism. The purpose of this thesis is to establish the optimal construction scheduling models with the consideration of resource constraint...