The Study of Reducing the Cycle Time for a Specific Order in the Wafer Fab
碩士 === 國立交通大學 === 工業工程與管理系 === 88 === The wafer fab usually has cooperating policy with specific customers to get long-term steady orders. These customers thus frequently transfer the costs of inaccurate sales forecasting to their suppliers, "wafer fabs", by changing the due date of a pre-...
Main Authors: | chenghua Lee, 李振樺 |
---|---|
Other Authors: | Shu-Hsing Chung |
Format: | Others |
Language: | zh-TW |
Published: |
2000
|
Online Access: | http://ndltd.ncl.edu.tw/handle/44298336273485067839 |
Similar Items
-
Fab cycle time improvement through inventory control : a wafer starts approach
by: Ward, Matthew John
Published: (2007) -
Design of Automated Material Handling Systems in Wafer Fab
by: Sammy Lee, et al.
Published: (2001) -
The RFID Application for Real Time Information Sharing System in Semiconductor Wafer Testing Fab
by: Huang, C.F., et al.
Published: (2010) -
A study of "fast-track" building of semiconductor wafer fab
by: 李仲明
Published: (1999) -
Route Planning for Two Wafer Fabs with Capacity Sharing Mechanisms
by: Chen-Fu Chen, et al.
Published: (2007)