Study on the Performance Evaluation of R&D Projetcs with Multi-periods
碩士 === 國立交通大學 === 工業工程與管理系 === 88 === In this research, we study the performance evaluation of R&D Projects by Data Envelopment Analysis. Due to R&D is a long-term investment, R&D projects should be evaluated by integrating information of current and past year. To evaluate performance of...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2000
|
Online Access: | http://ndltd.ncl.edu.tw/handle/17883954598914459072 |
id |
ndltd-TW-088NCTU0031015 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-088NCTU00310152015-10-13T10:59:52Z http://ndltd.ncl.edu.tw/handle/17883954598914459072 Study on the Performance Evaluation of R&D Projetcs with Multi-periods 科技研究發展專案的連續多期效率評估 Chih-Ting Lin 林治廷 碩士 國立交通大學 工業工程與管理系 88 In this research, we study the performance evaluation of R&D Projects by Data Envelopment Analysis. Due to R&D is a long-term investment, R&D projects should be evaluated by integrating information of current and past year. To evaluate performance of R&D projects with multi-periods is the major objective of this research. Traditionally, the evaluation of R&D projects is based on current year. In output point of view, it is good for a project in the mature-period or growth-period, but have disadvantage for a project just beginning or in the exploring-period. In this study propose the concept of multi-periods to improve the disadvantage of performance evaluation based on current year. This study adopts 5 years national R&D Projects Commissioned by Ministry of Economic Affair from 1994 to 1998. Using GIPOTE model(Goal、Inputs、Process、Outputs、Transfer、Effects) as evaluation framework to evaluation.The tool for performance evaluation in this sleedy is Data Envelopment Analysis. The major contributions of this study are: 1.Corresponding to the concept of efficiency frontior, this research provides multi-frontior curves to lable projects efficiency. 2.Changing the basis of efficiency classification from overall efficiency to technical efficiency in accordance with concept of efficiency frontior. 3.According to this research, it is different from evaluation with multi-periods to single-period. Shing-Ko Liang 梁馨科 2000 學位論文 ; thesis 74 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立交通大學 === 工業工程與管理系 === 88 === In this research, we study the performance evaluation of R&D Projects by Data Envelopment Analysis. Due to R&D is a long-term investment, R&D projects should be evaluated by integrating information of current and past year. To evaluate performance of R&D projects with multi-periods is the major objective of this research.
Traditionally, the evaluation of R&D projects is based on current year. In output point of view, it is good for a project in the mature-period or growth-period, but have disadvantage for a project just beginning or in the exploring-period. In this study propose the concept of multi-periods to improve the disadvantage of performance evaluation based on current year.
This study adopts 5 years national R&D Projects Commissioned by Ministry of Economic Affair from 1994 to 1998. Using GIPOTE model(Goal、Inputs、Process、Outputs、Transfer、Effects) as evaluation framework to evaluation.The tool for performance evaluation in this sleedy is Data Envelopment Analysis.
The major contributions of this study are:
1.Corresponding to the concept of efficiency frontior, this research provides multi-frontior curves to lable projects efficiency.
2.Changing the basis of efficiency classification from overall efficiency to technical efficiency in accordance with concept of efficiency frontior.
3.According to this research, it is different from evaluation with multi-periods to single-period.
|
author2 |
Shing-Ko Liang |
author_facet |
Shing-Ko Liang Chih-Ting Lin 林治廷 |
author |
Chih-Ting Lin 林治廷 |
spellingShingle |
Chih-Ting Lin 林治廷 Study on the Performance Evaluation of R&D Projetcs with Multi-periods |
author_sort |
Chih-Ting Lin |
title |
Study on the Performance Evaluation of R&D Projetcs with Multi-periods |
title_short |
Study on the Performance Evaluation of R&D Projetcs with Multi-periods |
title_full |
Study on the Performance Evaluation of R&D Projetcs with Multi-periods |
title_fullStr |
Study on the Performance Evaluation of R&D Projetcs with Multi-periods |
title_full_unstemmed |
Study on the Performance Evaluation of R&D Projetcs with Multi-periods |
title_sort |
study on the performance evaluation of r&d projetcs with multi-periods |
publishDate |
2000 |
url |
http://ndltd.ncl.edu.tw/handle/17883954598914459072 |
work_keys_str_mv |
AT chihtinglin studyontheperformanceevaluationofrdprojetcswithmultiperiods AT línzhìtíng studyontheperformanceevaluationofrdprojetcswithmultiperiods AT chihtinglin kējìyánjiūfāzhǎnzhuānàndeliánxùduōqīxiàolǜpínggū AT línzhìtíng kējìyánjiūfāzhǎnzhuānàndeliánxùduōqīxiàolǜpínggū |
_version_ |
1716835252880539648 |