台鐵財務規劃預測模型之研究

碩士 === 輔仁大學 === 應用統計研究所 === 88 ===   Taiwan railway system was constructed first with 106.7 km length betweem Keelung and Hsinchu by Taiwan Governor Liu Ming Chu'an at the 13th year of Guang Shue (1887 A. D.), and built sucessively through the era of Japanese occupation, going through many expa...

Full description

Bibliographic Details
Main Author: 蔡瑞端
Other Authors: 廖佩珊
Format: Others
Language:zh-TW
Published: 2000
Online Access:http://ndltd.ncl.edu.tw/handle/13693034785397422899