A Distribution Management Model Integrating Price Discount Distribution Requirements Planning & Vehicle Routing Problem with Time Windows
碩士 === 大葉大學 === 工業工程研究所 === 88 === In this research, we consider a management model in which a distribution requirement planning (DRP) model and vehicle routing planning (VRP) model are integrated with minimization of total cost objective. The quantity discount and time window constraints are taken...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2000
|
Online Access: | http://ndltd.ncl.edu.tw/handle/29202256067398358102 |
id |
ndltd-TW-088DYU00030010 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-088DYU000300102015-10-13T11:53:30Z http://ndltd.ncl.edu.tw/handle/29202256067398358102 A Distribution Management Model Integrating Price Discount Distribution Requirements Planning & Vehicle Routing Problem with Time Windows 結合數量折扣型配銷需求規劃(DRP)及時窗限制車輛途程問題(VRPTW)之配銷管理模式 Bao-Yuan, Lin 林保源 碩士 大葉大學 工業工程研究所 88 In this research, we consider a management model in which a distribution requirement planning (DRP) model and vehicle routing planning (VRP) model are integrated with minimization of total cost objective. The quantity discount and time window constraints are taken into account during integrated model construction. The research is completed in the two ways: one is using the 0-1 mathematical programming for model development; however, the mathematical programming model can not get a optimal solution in a reasonable running time, the heuristic algorithm is, thus, employed to reduce the running time consumption. The example illustrations show that the construct heuristic performs well both in the solution quality and efficiency. Chin-Yao, Low 駱景堯 2000 學位論文 ; thesis 0 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 大葉大學 === 工業工程研究所 === 88 === In this research, we consider a management model in which a distribution requirement planning (DRP) model and vehicle routing planning (VRP) model are integrated with minimization of total cost objective. The quantity discount and time window constraints are taken into account during integrated model construction.
The research is completed in the two ways: one is using the 0-1 mathematical programming for model development; however, the mathematical programming model can not get a optimal solution in a reasonable running time, the heuristic algorithm is, thus, employed to reduce the running time consumption. The example illustrations show that the construct heuristic performs well both in the solution quality and efficiency.
|
author2 |
Chin-Yao, Low |
author_facet |
Chin-Yao, Low Bao-Yuan, Lin 林保源 |
author |
Bao-Yuan, Lin 林保源 |
spellingShingle |
Bao-Yuan, Lin 林保源 A Distribution Management Model Integrating Price Discount Distribution Requirements Planning & Vehicle Routing Problem with Time Windows |
author_sort |
Bao-Yuan, Lin |
title |
A Distribution Management Model Integrating Price Discount Distribution Requirements Planning & Vehicle Routing Problem with Time Windows |
title_short |
A Distribution Management Model Integrating Price Discount Distribution Requirements Planning & Vehicle Routing Problem with Time Windows |
title_full |
A Distribution Management Model Integrating Price Discount Distribution Requirements Planning & Vehicle Routing Problem with Time Windows |
title_fullStr |
A Distribution Management Model Integrating Price Discount Distribution Requirements Planning & Vehicle Routing Problem with Time Windows |
title_full_unstemmed |
A Distribution Management Model Integrating Price Discount Distribution Requirements Planning & Vehicle Routing Problem with Time Windows |
title_sort |
distribution management model integrating price discount distribution requirements planning & vehicle routing problem with time windows |
publishDate |
2000 |
url |
http://ndltd.ncl.edu.tw/handle/29202256067398358102 |
work_keys_str_mv |
AT baoyuanlin adistributionmanagementmodelintegratingpricediscountdistributionrequirementsplanningvehicleroutingproblemwithtimewindows AT línbǎoyuán adistributionmanagementmodelintegratingpricediscountdistributionrequirementsplanningvehicleroutingproblemwithtimewindows AT baoyuanlin jiéhéshùliàngzhékòuxíngpèixiāoxūqiúguīhuàdrpjíshíchuāngxiànzhìchēliàngtúchéngwèntívrptwzhīpèixiāoguǎnlǐmóshì AT línbǎoyuán jiéhéshùliàngzhékòuxíngpèixiāoxūqiúguīhuàdrpjíshíchuāngxiànzhìchēliàngtúchéngwèntívrptwzhīpèixiāoguǎnlǐmóshì AT baoyuanlin distributionmanagementmodelintegratingpricediscountdistributionrequirementsplanningvehicleroutingproblemwithtimewindows AT línbǎoyuán distributionmanagementmodelintegratingpricediscountdistributionrequirementsplanningvehicleroutingproblemwithtimewindows |
_version_ |
1716849673899081728 |